Executive Summary
|
|
See previous SitReps for this information.
|
1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
|
|
Contract Number: |
|
D.O. Number: |
|
|
Action Memo Date: |
|
Response Authority: |
Stafford Act |
|
Response Type: |
|
Response Lead: |
FEMA |
|
Incident Category: |
|
NPL Status: |
Non NPL |
|
Operable Unit: |
|
Mobilization Date: |
12/31/2015 |
|
Start Date: |
12/31/2015 |
Demob Date: |
|
|
Completion Date: |
|
CERCLIS ID: |
|
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
|
1.1.1 Incident Category
See previous SitReps for this information.
1.1.2 Site Description
See previous SitReps for this information.
1.1.2.1 Location
See previous SitReps for this information.
1.1.2.2 Description of Threat
Flooding in Missouri
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results.
Continued coordination with MDNR
|
|
1.2 Incident Objectives
|
|
|
See previous SitReps for this information.
|
|
1.3 Critical Resource Needs
|
|
|
No information available at this time.
|
|
1.4 Strategic Considerations
|
|
|
See previous SitReps for this information.
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
2.1.1 Narrative
FEMA has issued a mission assignment to EPA to staff the ESF#10 desk at the FEMA RRCC, the FEMA JFO, and to conduct ESF#10 operations for HHW and orphan containers.
2.1.2 Response Actions to Date
See previous SitReps for previous information.
January 6, 2016
Access was granted for one staging area. ERRS DO and START TO have been finalized and contractors have reported to work. Collection of flood related ESF#10 related material began today and will be brought back to the newly established staging area on MoDOT property near Route 66 State Park off I44 in Eureka, MO. Collections are beginning at the Eureka (Legion Park) location.
Coordinated with impacted cities to provide assistance and guidance in the collection process. Large collections are already beginning in Pacific and Union by municipalities. START team members were on hand with Arnold collection efforts.
Further collection assessments were performed throughout the affected area by MDNR and they are distributing the collection guidance created by EPA.
Land recon activities are completed in St. Charles County, and continuing in Fenton.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
2.1.4 Progress Metrics
|
|
2.2 Planning Section
|
|
|
2.2.1 Anticipated Activities
Staff the FEMA JFO and provide assistance as needed to the state.
Assess and recon flooded areas to begin HHW and Orphan drum and container operations.
The Region 7 REOC was activated to assist with all field operations.
2.2.1.1 Planned Response Activities
Establish additional staging locations and coordinate with the state on HHW and orphan container collection and recovery operations.
2.2.1.2 Next Steps
Conduct pre-sampling of staging areas once access agreements have been established. Begin recovering HHW and orphan containers and bring back to staging area.
2.2.2 Issues
|
|
2.3 Logistics Section
|
|
|
Currently, only 4 EPA OSCs have been mobilized and each will take care of their own logistics.
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
2.5.1 Safety Officer
Each of the EPA OSCs will act as safety officers during the initial setup stage of this assignment.
2.5.2 Liaison Officer
2.5.3 Information Officer
An EPA information officer from the Kansas City Regional office is coordinating with the disaster related JIC.
|
3. Participating Entities
|
|
3.1 Unified Command
FEMA, EPA, and MDNR
3.2 Cooperating Agencies
|
4. Personnel On Site
|
|
There are currently 4 EPA OSCs in theatre. Contracting documents were finalized, resulting in contractor personnel arriving onsite January 6, 2016.
|
5. Definition of Terms
|
|
No information available at this time.
|
6. Additional sources of information
|
|
No information available at this time.
|
7. Situational Reference Materials
|
|
No information available at this time.
|