Harper Industries

All POL/SITREP's for this site Harper Industries
Cleveland, OH - EPA Region V
POLREP #3
Final POLREP
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Harper Industries - Removal Polrep
Final Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V

Subject: POLREP #3
Final POLREP
Harper Industries

Cleveland, OH
Latitude: 41.4890169 Longitude: -81.6165570


To:
From: James Augustyn, OSC
Date: 12/14/2016
Reporting Period: October 14 - November 22, 2016

1. Introduction
  1.1 Background
   
Site Number: C5AK    Contract Number: EPS41602
D.O. Number: 0005    Action Memo Date:  
Response Authority: CERCLA    Response Type: Time-Critical
Response Lead: EPA    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 9/26/2016    Start Date: 9/26/2016
Demob Date: 10/24/2016    Completion Date: 11/22/2016
CERCLIS ID: OHN000506130    RCRIS ID:
ERNS No.:    State Notification: OEPA Referral
FPN#:    Reimbursable Account #:

1.1.1 Incident Category

Time Critical Removal Action

1.1.2 Site Description

The Site was historically used as a manufacturing and office building.  Five out of six buildings were demolished by the property owner to salvage scrap metal.  Asbestos was not properly abated from the five buildings prior to demolition and it is present in the remaining demolition debris at the Site.  The property is vacant and open to trespass.

See POLREP #1 for Additional Details

1.1.2.1 Location

10101 Woodland Avenue, Cleveland, Cuyahoga County, Ohio 44104

1.1.2.2 Description of Threat

See POLREP #1 for Details

1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results

See POLREP #1 for Details 

 


2. Current Activities
  2.1 Operations Section
   

2.1.1 Narrative

See POLREP #1 for Details

2.1.2 Response Actions to Date

On Friday, October 14th, START conducted perimeter air sampling and perimeter air monitoring. ERRS and START sampled the two ‘mystery’ drums onsite: the blue poly drum appeared to be used motor oil and the ‘fuel oil additive’ drum appeared to be a solvent or, a fuel additive.  Chemtron LLC out of Avon Lake, Ohio arrived onsite to take samples for characterization. ERRS plans to ship drums to Chemtron. ERRS lined, loaded, wrapped, and sent a total of eleven (11) trucks offsite carrying ACM-contaminated debris for disposal at American Landfill, Waynesburg, Ohio.

On Monday, 17th, START conducted perimeter air monitoring. ERRS brought down the southern wall along Woodland Ave. Debris was combined with onsite ACM-contaminated debris to removed from the site. Traffic control was utilized to close the curb lane of Woodland Ave during the demolition. Temporary snow fencing was installed until permanent fencing can be installed. START directed ERRS in cleaning loose ACM pipe wrap inside the building. 

On Tuesday, 18th, START conducted perimeter air sampling and perimeter air monitoring. ERRS wetted and double bagged loose ACM TSI pipe wrap on the first floor of the building to be distributed throughout truckloads hauling ACM-contaminated debris to the landfill. ERRS collected a total of 27 bags. American Fence installed a permanent fence where the wall was taken down along Woodland Ave. ERRS took one pressurized gas cylinder offsite to Linde Air Company of Garfield Heights , Ohio for disposal. ERRS lined, loaded, wrapped, and sent a total of thirteen (13) trucks offsite carrying ACM-contaminated debris for disposal at American Landfill, Waynesburg, Ohio.

On Wednesday, 19th, START conducted perimeter air sampling and perimeter air monitoring. ERRS wetted and double bagged loose ACM TSI pipe wrap on the first floor of the building to be distributed throughout truckloads hauling ACM-contaminated debris to the landfill. ERRS collected two bags. The roll-off box containing scrap metal was hauled offsite to American Metal Processing Company of Cleveland, Ohio for recycling. ERRS lined, loaded, wrapped, and sent a total of eleven (11) trucks offsite carrying ACM-contaminated debris for disposal at American Landfill, Waynesburg, Ohio. All ACM-contaminated debris has been removed from the site. ERRS deconned the excavators and skid steer for demobilization from the site on Friday, 21st

On Tuesday, November 22, ERRS oversaw the removal of two waste drums: one coal tar waste drum and one fuel oil additive drum. Drums were transported by Chemtron Corporation to their yard for disposal in Avon Lake, Ohio.

Load Number

Date

Subcontractor

Disposal Facility

Manifest #

Weight (tons)

1

10/07/16

Waste Management

American Landfill

1

20.08

2

10/07/16

Waste Management

American Landfill

2

19.11

3

10/07/16

Waste Management

American Landfill

547455

16.61

4

10/07/16

Waste Management

American Landfill

547456

20.78

5

10/07/16

Waste Management

American Landfill

547457

20.58

6

10/07/16

Waste Management

American Landfill

547458

22.37

7

10/07/16

Waste Management

American Landfill

547459

21.35

8

10/07/16

Waste Management

American Landfill

547460

26.85

9

10/07/16

Waste Management

American Landfill

547461

28.92

10

10/07/16

Waste Management

American Landfill

547462

26

11

10/07/16

Waste Management

American Landfill

547463

24.47

12

10/07/16

Waste Management

American Landfill

547464

24.81

13

10/07/16

Waste Management

American Landfill

547465

30.1

14

10/07/16

Waste Management

American Landfill

547466

28.5

15

10/07/16

Waste Management

American Landfill

547467

33.82

16

10/12/16

Waste Management

American Landfill

547468

25.37

17

10/12/16

Waste Management

American Landfill

547469

25.2

18

10/12/16

Waste Management

American Landfill

547470

23.77

19

10/12/16

Waste Management

American Landfill

547471

21.86

20

10/12/16

Waste Management

American Landfill

547472

21.76

21

10/12/16

Waste Management

American Landfill

547473

22.69

22

10/12/16

Waste Management

American Landfill

547474

21.55

23

10/12/16

Waste Management

American Landfill

547475

25.21

24

10/12/16

Waste Management

American Landfill

547476

22.35

25

10/12/16

Waste Management

American Landfill

547477

22.91

26

10/12/16

Waste Management

American Landfill

547478

23.01

27

10/12/16

Waste Management

American Landfill

547479

22.38

28

10/12/16

Waste Management

American Landfill

547480

26.74

29

10/12/16

Waste Management

American Landfill

547481

22.92

30

10/12/16

Waste Management

American Landfill

547628

21.13

31

10/12/16

Waste Management

American Landfill

547629

20.48

32

10/12/16

Waste Management

American Landfill

547630

24.97

33

10/12/16

Waste Management

American Landfill

547631

22.6

34

10/12/16

Waste Management

American Landfill

547632

20.61

35

10/12/16

Waste Management

American Landfill

547633

20.9

36

10/12/16

Waste Management

American Landfill

547634

19.18

37

10/12/16

Waste Management

American Landfill

547635

21.03

38

10/12/16

Waste Management

American Landfill

547636

26.3

39

10/12/16

Waste Management

American Landfill

547637

21.86

40

10/13/16

Waste Management

American Landfill

547638

17.99

41

10/13/16

Waste Management

American Landfill

547639

19.04

42

10/13/16

Waste Management

American Landfill

547640

20.68

43

10/13/16

Waste Management

American Landfill

547641

21.51

44

10/13/16

Waste Management

American Landfill

547642

20.22

45

10/13/16

Waste Management

American Landfill

547643

24.03

46

10/13/16

Waste Management

American Landfill

547644

25.87

47

10/13/16

Waste Management

American Landfill

547645

21.4

48

10/13/16

Waste Management

American Landfill

547646

22.5

49

10/13/16

Waste Management

American Landfill

547647

20.58

50

10/13/16

Waste Management

American Landfill

547648

22.31

51

10/13/16

Waste Management

American Landfill

547649

24.76

52

10/13/16

Waste Management

American Landfill

547650

21.71

53

10/13/16

Waste Management

American Landfill

547651

20.37

54

10/13/16

Waste Management

American Landfill

547652

22.69

55

10/13/16

Waste Management

American Landfill

547653

22.32

56

10/13/16

Waste Management

American Landfill

547654

24.57

57

10/13/16

Waste Management

American Landfill

547655

22.5

58

10/13/16

Waste Management

American Landfill

547656

22.68

59

10/13/16

Waste Management

American Landfill

547657

23.05

60

10/13/16

Waste Management

American Landfill

547658

22.76

61

10/13/16

Waste Management

American Landfill

547659

22.81

62

10/13/16

Waste Management

American Landfill

547660

21.41

63

10/14/16

Waste Management

American Landfill

547661

20.47

64

10/14/16

Waste Management

American Landfill

547662

25.71

65

10/14/16

Waste Management

American Landfill

547663

19.41

66

10/14/16

Waste Management

American Landfill

547664

20.56

67

10/14/16

Waste Management

American Landfill

547665

22.36

68

10/14/16

Waste Management

American Landfill

547666

21.71

69

10/14/16

Waste Management

American Landfill

547667

20.46

70

10/14/16

Waste Management

American Landfill

547668

26.82

71

10/14/16

Waste Management

American Landfill

547669

22.78

72

10/14/16

Waste Management

American Landfill

547670

22.33

73

10/14/16

Waste Management

American Landfill

547671

23.16

74

10/18/16

Waste Management

American Landfill

547672

24.34

75

10/18/16

Waste Management

American Landfill

547677

20.24

76

10/18/16

Waste Management

American Landfill

547678

20.80

77

10/18/16

Waste Management

American Landfill

547679

21.31

78

10/18/16

Waste Management

American Landfill

547680

20.84

79

10/18/16

Waste Management

American Landfill

547681

20.15

80

10/18/16

Waste Management

American Landfill

547682

19.19

81

10/18/16

Waste Management

American Landfill

547683

19.76

82

10/18/16

Waste Management

American Landfill

547684

18.79

83

10/18/16

Waste Management

American Landfill

547685

19.01

84

10/18/16

Waste Management

American Landfill

547686

19.73

85

10/18/16

Waste Management

American Landfill

547687

20.85

86

10/18/16

Waste Management

American Landfill

547688

19.06

87

10/19/16

Waste Management

American Landfill

547689

20.06

88

10/19/16

Waste Management

American Landfill

547690

22.11

89

10/19/16

Waste Management

American Landfill

547691

17.88

90

10/19/16

Waste Management

American Landfill

547692

18.27

91

10/19/16

Waste Management

American Landfill

547693

22.59

92

10/19/16

Waste Management

American Landfill

547694

21.44

93

10/19/16

Waste Management

American Landfill

547695

21.22

94

10/19/16

Waste Management

American Landfill

547696

20.78

95

10/19/16

Waste Management

American Landfill

547697

22.03

96

10/19/16

Waste Management

American Landfill

547698

20.58

97

10/19/16

Waste Management

American Landfill

547699

22.64

98

10/19/16

Waste Management

American Landfill

547700

19.12

99

10/19/16

Waste Management

American Landfill

547701

21.94

100

10/19/16

Waste Management

American Landfill

547702

16.63

101

10/19/16

Waste Management

American Landfill

547703

15.68

Total

2231.70

2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)

See POLREP #1 for Details

2.1.4 Progress Metrics

As of 10/6/16, EPA has shipped 21 truck loads of nonhazardous municipal solid waste off site to American Landfill, Waynesburg, OH.  Cumulative tonnage of nonhazardous solid waste to date is 280.86.

As of 10/19/16, EPA has shipped 101 truck loads of ACM contaminated debris off site to American Landfill, Waynesburg, OH.  Cumulative tonnage of ACM contaminated debris to date is estimated at 2,232 tons

Regional Metrics
This is an Integrated River Assessment. The numbers should overlap. Miles of river systems cleaned and/or restored NA
Cubic yards of contaminated sediments removed and/or capped NA
Gallons of oil/water recovered NA
Acres of soil/sediment cleaned up in floodplains and riverbanks NA
Stand Alone Assessment Number of contaminated residential yards cleaned up NA
Number of workers on site 12
Contaminant(s) of Concern Asbestos
Oil Response Tracking
Estimated volume Initial amount released NA
Final amount collected NA
CANAPS Info FPN Ceiling Amount NA
FPN Number NA
Body of Water affected NA
Administrative and Logistical Factors (Place X where applicable)
X Precedent-Setting HQ Consultations (e.g., fracking, asbestos)   Community challenges or high involvement   Radiological
  More than one PRP   Endangered Species Act / Essential Fish Habitat issues   Explosives
  AOC   Historic preservation issues   Residential impacts
  UAO   NPL site   Relocation
  DOJ involved   Remote location   Drinking water impacted
  Criminal Charges Have Been Filed*   Extreme weather or abnormal field season X Environmental justice
  Tribal consultation or coordination or other issues   Congressional involvement   High media interest
  Statutory Exemption for $2 Million   Statutory Exemption for 1 Year   Active fire present
  Hazmat Entry Conducted – Level A, B or C   Incident or Unified Command established   Actual air release (not threatened)
Green Metrics
Metric Amount Units
Diesel Fuel Used 872 gallons
Unleaded Fuel Used 253 gallons
Alternative/E-85 Fuel Used 0 gallons
Electricity from electric company   NA kWh
Electric Company Name and Account # NA  
Electricity from sources other than the electric company NA kWh
Solid waste reused NA  
Solid waste recycled 25 ton
Water Used   UNK gallons



  2.2 Planning Section
   

2.2.1 Anticipated Activities
None

2.2.1.1 Planned Response Activities
None

2.2.1.2 Next Steps

No further actions

2.2.2 Issues

None

  2.3 Logistics Section
    No information available at this time.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    No information available at this time.

3. Participating Entities
  No information available at this time.

4. Personnel On Site
 

EPA - 3

START - 1

ERRS - 8

5. Definition of Terms
  No information available at this time.

6. Additional sources of information
  No information available at this time.

7. Situational Reference Materials
  No information available at this time.