Big River Mine Tailings Site, OU1 -- Area of Response

All POL/SITREP's for this site Big River Mine Tailings Site, OU1 -- Area of Response
Park Hills, MO - EPA Region VII
POLREP #12
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Big River Mine Tailings Site, OU1 -- Area of Response - Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region VII

Subject: POLREP #12
Big River Mine Tailings Site, OU1 -- Area of Response
07CR
Park Hills, MO
Latitude: 37.8625800 Longitude: -90.5087260


To:
From: Janice Kroone, OSC
Date: 7/21/2014
Reporting Period: July 5 - 18, 2014

1. Introduction
  1.1 Background
   
Site Number: 07CR    Contract Number: ERRS:EPS71305
D.O. Number: ERRS:0036    Action Memo Date: 12/6/2010
Response Authority: CERCLA    Response Type: Time-Critical
Response Lead: EPA    Incident Category: Removal Action
NPL Status: NPL    Operable Unit: 01
Mobilization Date: 4/21/2014    Start Date: 4/28/2014
Demob Date:      Completion Date:  
CERCLIS ID: MOD98112689    RCRIS ID:
ERNS No.:    State Notification:
FPN#:    Reimbursable Account #:

1.1.1 Incident Category

Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA) incident category: Inactive Production Facility (Mining-Metals [Pb]).

1.1.2 Site Description

1.1.2.1 Location

The 2014 Big River Mine Tailings Site, OU-1 (Site) action consists of excavation at residential properties where lead in soil exceed screening levels of 800 milligrams/kilogram (mg/kg) and children less than 84 months of age reside. The Site is within the boundaries of St. Francois County, Missouri. This response action does not include ongoing actions at other sub-sites (e.g. Lake Timberline sub-site and Iron Mountain Lake sub-site). The primary focus of this action lies within the “Area of Contamination” established in the 2004 Administrative Order on Consent between the EPA and the Doe Run Company. 

 

The Site exists within an area of approximately 436 square miles and includes all of St. Francois County with the exception of the former Mine La Motte tract that extends into St. Francois County’s southern border just north of the community of Mine La Motte, Missouri. St. Francois County is the location of a former mining region known as the "Old Lead Belt." The area is still referred to as the “Mineral Area.” The population center of the area is located approximately 70 miles south of St. Louis. Seven large areas of mine waste covering an area of approximately 110 square miles are present within the Site. The areas included are the Bonne Terre Mine Tailings Site, the Leadwood Mine Tailings Site, the Elvins Mine Tailings Site, the Federal Mine Tailings Site, the Desloge Mine Tailings Site, the National Mine Tailings Site and the Doe Run Mine Tailings Site. Migration of lead-contaminated mine waste from these large tailings piles through human and environmental mechanisms has occurred. This response is not limited to these mine waste areas.

1.1.2.2 Description of Threat

See POLREP #1 (Initial POLREP).


1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results

See POLREP #1 (Initial POLREP).


2. Current Activities
  2.1 Operations Section
    2.1.1 Narrative

The Site consists of residential properties in St. Francois County and within the “Area of Contamination” established in the 2004 Administrative Order on Consent between the EPA and the Doe Run Company, Missouri. The EPA discovered surface soils at the Site to have elevated concentrations of lead.

2.1.2 Response Actions to Date

As access agreements are signed, site walks with the EPA On Scene Coordinator, resident, START and ERRs Contractor are conducted on the properties prior to the excavation. During the site walk, any utility lines and landscaping issues are discussed with the property owner. Also, an instruction sheet on how to care for the sod is discussed and provided to the property owner. Once the sod is placed, the sod is watered by ERRS until it takes root and then at that time the care of the sod and any hydroseeded areas are turned over to the property owner to water and care for.

Excavations began on April 29, 2014, at residential properties on the Site. The excavated soil is hauled to the Bonne Terre East Repository. As of July 18, 2014, the following properties have been excavated:

Property ID       Date Excavation Completed      Cubic Yards Excavated

  9001                        05/06/2014                              543      
  9313                        05/02/2014                              402  
  9316                        05/08/2014                              210
  9288                        05/12/2014                              298
  9481                        05/12/2014                              140
  2689                        05/19/2014                              487
  9120                        05/16/2014                              160
  9331                        05/20/2014                              265
  9006                        05/22/2014                              348
  9401                        05/22/2014                              280
  9225                        05/29/2014                              194
  9380                        06/02/2014                              432
  9399                        06/03/2014                              239
  9498                        06/06/2014                              390
  9398                        06/05/2014                              100
  9459                        06/09/2014                              254 
  9054                        06/12/2014                              172 
  9105                        06/12/2014                              283
  9104                        06/18/2014                        `     720
  9460                        06/13/2014                              148
  2929                        06/17/2014                              312
  9436                        06/18/2014                              193
  9466                        06/23/2014                              342
  2600                        06/26/2014                              304
  2640                        06/27/2014                              211
  9013                        07/03/2014                              740
  9448                        07/02/2014                              491
  1409                        07/09/2014                              128
  9265                        07/10/2014                              608  
  9272                        07/10/2014                              148
  1827                        07/15/2014                              433  
  1399                        07/15/2014                              328  
  1871                        07/16/2014                              162  
  9214                        07/17/2014                              162  
 
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)

See Polrep #6.

2.1.4 Progress Metrics

Waste Stream Medium Quantity Manifest # Treatment Disposal
Lead-Contaminated Soil (ERRS contract; excavations conducted during 2014) Solid  10,727 yd   N/A N/A Bonne Terre East (Tailings Pile) Repository
Lead-Contaminated Soil  (ERRS contract; excavations conducted prior to 2014)  Solid  128,706yd3  N/A  N/A Desloge Tailings Pile
Lead-Contaminated Soil (Site-specific contract; excavations conducted prior to 2014) Solid 42,531 yd3 N/A N/A Bonne Terre East Tailings Pile
 Total   181,964 yd3      



  2.2 Planning Section
    2.2.1 Anticipated Activities

2.2.1.1 Planned Response Activities

Excavate, backfill, sod and hydroseed properties.

2.2.1.2 Next Steps

Continue to obtain access agreements, conduct site screening on properties, conduct site walks, excavate, backfill and restore residential properites which meet the excavation criteria for this action.

2.2.2 Issues

Heavy rains have impacted the excavation, backfill and sodding schedule. 

  2.3 Logistics Section
    All logistical issues are being addressed by EPA and EPA contractors.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    2.5.1 Safety Officer

No significant safety issues reported during this operational period.

2.6 Liaison Officer

2.7 Information Officer

2.7.1 Public Information Officer

At this time there is no PIO assigned to this site.

2.7.2 Community Involvement Coordinator

At this time there is no CIC assigned to this site. See Polrep #6 for information on previous Public Availability Sessions and other details on community outreach.

3. Participating Entities
  3.1 Unified Command

The limited scope of the response does not warrant a full Incident Management Team (IMT) or Unified Command.  Operations, safety, logistics, planning and finance functions are primarily being handled by contractor staff.

3.2 Cooperating Agencies

Cooperating and assisting agencies include:

City of Park Hills,
City of Leadwood,
City of Bonne Terre,
City of Doe Run,
City of Desloge,
Missouri Department of Natural Resources,
Missouri Department of Health and Senior Services

4. Personnel On Site
  EPA
ERRS
START

5. Definition of Terms
 
AOC Area of Contamination / Administrative Order on Consent
AOR Area of Response
ATSDR Agency for Toxic Substances and Disease Registry
CAMU Corrective Action Management Unit
CERCLA Comprehensive Environmental Response, Compensation, and Liability Act
EPA Environmental Protection Agency
ERRS Emergency & Rapid Response Services Contract
MDHSS Missouri Department of Health and Senior Services
MDNR Missouri Department of Natural Resources
mg/L milligrams per Liter
mg/kg milligrams per kilogram
NCP National Contingency Plan
ng/m3 nanograms per cubic meter
NPL National Priorities List
OSC On-Scene Coordinator
OSHA Occupational Safety and Health Administration
OU Operable Unit
Polrep Pollution Report
PPE Personal Protective Equipment
PPM Part Per Million
PRP Potentially Responsible Party
RCRA Resource Conservation and Recovery Act
RPM Remedial Project Manager
Sitrep Situation Report
START Superfund Technical Assessment and Response Team
SS Site Specific
SU Sample Unit
TCLP Toxicity Characteristic Leaching Procedure
XRF X-Ray Fluorescent Spectrometer
yd3 Cubic Yard


6. Additional sources of information
  6.1 Internet location of additional information/report

For additional information, please refer to http://www.epaosc.org/BRAOR

6.2 Reporting Schedule

The Pollution Report (PolRep) serves as the OSC's record of the response actions, notifications and decisions made to support the response action. PolReps will be completed and posted as conditions warrant and at the conclusion of site activities.

7. Situational Reference Materials
  Please refer to the documents section of http://www.epaosc.org/BRAOR for maps, data, diagrams, etc.