Site Number: |
B5ZC |
|
Contract Number: |
EP-S5-08-04 |
D.O. Number: |
0051 |
|
Action Memo Date: |
8/9/2012 |
Response Authority: |
CERCLA |
|
Response Type: |
Time-Critical |
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
NPL Status: |
Non NPL |
|
Operable Unit: |
|
Mobilization Date: |
8/20/2012 |
|
Start Date: |
8/22/2012 |
Demob Date: |
|
|
Completion Date: |
|
CERCLIS ID: |
MIN000510500 |
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
|
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
Time-Critical
1.1.2 Site Description
The Ironwood Manufactured Gas Plant (MGP) Site is the location of a former coal gasification plant. Reportedly, the plant was constructed in 1911 and operated using a carbureted water gas (CWG) process. A review of Sanborn maps indicates that the processes at the Site were consistent with typical CWG processes for the era. These processes generally included a first step in which coke or coal was heated in a closed vessel or retort into which steam was injected. A flammable gas mixture of methane and carbon monoxide was produced. In some cases petroleum products may have been applied to the heated mixture increasing the flammability of the resultant gas mixture. During these processes, a dense, oily liquid known as coal tar would condense out of the gas at various stages during its production, purification and distribution, and the coal tar would need to be either recycled in the process, sold, or otherwise disposed of.
The plant continued operations and distribution of manufactured gas until the late 1950's when natural gas pipelines and service became more readily available in the area. By 1956 the plant was for sale and based on accounts of the Wisconsin Public Service Commission, by 1961 had discontinued service to Hurley, including the removal of meters following abandonment.
Interviews conducted by the Michigan Department of Environmental Quality (MDEQ) with local residents indicate that the buildings at the Site were removed prior to the gasometers (gas storage tanks). Based on the historical accounts, the surface structures at the Site were demolished and removed during the 1970's and the 1980's. Following removal of the surface structures, the Site was reportedly used by the City of Ironwood for the storage of inoperable equipment and debris.
1.1.2.1 Location
The Site does not have a physical address but is located on the northwest corner of Hemlock Street and West Ayer Street in Ironwood, Gogebic County, Michigan
1.1.2.2 Description of Threat
The Site contains MGP waste material, such as coal tar and other process waste, that are the source of hazardous substances that have migrated and are migrating into soil, groundwater, surface water, and sediments of the Montreal River. Contaminants of concern identified in soil, groundwater, surface water, and sediment include volatile organic compounds (VOCs), semivolatile organic compounds (SVOCs), polyaromatic hydrocarbons (PAHs) and inorganic contaminants.
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
During bridge construction at West Norrie Street in 2010, construction crews identified visually contaminated soils suspected to be from the former Ironwood Manufactured Gas Plant site located approximately 700' upstream. MDEQ developed a Site Inspection Work Plan in 2010 to characterize conditions in the subsurface at the Site as well as in the surface water and sediment in the adjacent Montreal River. The Site Inspection activities performed by the MDEQ were implemented with the intent of evaluating groundwater, surface water, and soil exposure pathways.
The results of the MDEQ’s Site Inspection indicated the presence of uncontrolled hazardous substances at the Site. Gross tar and MGP process waste contamination was discovered in the surface and subsurface soil primarily located in the historical operating area of the Site, which contained VOC's, SVOC's, and inorganic contaminant concentrations exceeding the MDEQ Part 201 Residential Direct Contact Criteria (RDCC) and Groundwater Surface-water Interface (GSI). Based on these findings, MDEQ requested assistance from USEPA.
USEPA conducted a site reconnaissance visit on November 19, 2010 to evaluate site conditions and to gather logistical information to assist in the development of a supplement site assessment plan.
A Supplemental Site Assessment was conducted during the week of April 9, 2012. The Supplemental Site Assessment demonstrated that coal tar and other MGP waste remain buried at the Site in a visually discreet layer and that contaminants from this buried waste (volatile and semi-volatile organic compounds and inorganic compounds) are migrating into the groundwater and surface water (Montreal River).
|
|
|
2.1.1 Response Actions to Date
See Previous Polreps for details regarding activities during previous reporting periods.
Significant Site Activities for this reporting period (9/10/12 - 9/20/12):
- Completed vegetation removal and chipping
- Completed excavation of contaminated material along river bank
- Commenced excavation in former process areas and continued backfilling excavated areas
- Discovered two additional buried vats of waste (three identified to date)
- Completed stabilization and removal of material in coal tar vats
- Continued to haul MGP waste to the landfill (7,250 Tons to date)
- Continued air monitoring efforts and dust control measures
- Continued to work with the City of Ironwood on Restoration Plan
- Continued community office hours
2.1.2 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
The City of Ironwood is the former owner and operator of the Ironwood Gas Works and is the only PRP for this Site. The City does not have the ability to conduct the clean-up, but is assisting by contributing in-kind services.
2.1.3 Progress Metrics
Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
Coal Tar Soil |
Soil |
7,250 tons
(145 loads) |
T75386 -
T75531 |
Landfill |
K&W Landfill, Ontonagon, MI |
|
|
|
2.2.1 Anticipated Activities
USEPA will hold community office hours every Thursday evening from 5pm to 6 pm in the Engineering Room on the second floor of the City of Ironwood's Memorial Building, 213 S. Marquette Street
2.2.1.1 Planned Response Activities & Next Steps
The following activities are planned for the next reporting period:
- Continue excavation of contaminated material and backfilling
- Continue to transport and dispose of MGP waste
- Relocate the on-site haul road
- Continue air monitoring efforts and dust control measures
- Finalize the Site Restoration Plan
- Begin Site restoration (grading of excavated areas)
- Continue community office hours
Site activities will be shut down from September 21-25, 2012 to allow the City to pave Ayer and Hemlock Streets and to provide the crew a short break. Security will be on-site around the clock while operations are shut down.
2.2.2 Issues
The City streets adjacent to the Site (Hemlock & Ayer Streets) are still under construction as part of the City's sewer and water line replacement project. Paving is scheduled during the Site shut down period. If paving does not occur as scheduled, delays associated with transportation and disposal, as well as additional cost will be realized.
Inclement weather has resulted in some down time.
|