1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
B4K2 |
|
Contract Number: |
EP-S4-07-04 |
D.O. Number: |
130 |
|
Action Memo Date: |
6/30/2011 |
Response Authority: |
CERCLA |
|
Response Type: |
Time-Critical |
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
NPL Status: |
Non NPL |
|
Operable Unit: |
|
Mobilization Date: |
6/22/2011 |
|
Start Date: |
6/22/2011 |
Demob Date: |
|
|
Completion Date: |
|
CERCLIS ID: |
SCD987673458 |
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
6/21/11 |
FPN#: |
|
|
Reimbursable Account #: |
|
For background information including Site Description, Location, and Description of Threat please refer to previous POLREPs.
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
2.1.1 Narrative
EPA has transitioned from the Emergency Response Phase of the project into the Time-Critical Removal Phase. However, the dangers at the Site continue to pose an immediate threat to human health and the environment. The current focus at the Site is to mitigate the immediate threats of release from the Site to off-site migration pathways. EPA's estimated time to complete the removal is roughly 4-5 months.
2.1.2 Response Actions to Date
To date the following response activities were completed during this reporting period:
- A subcontractor was brought in to lab pack the chemicals in the chemical lab portion of building 2. The lab was completed on July 27; this included neutralizing two containers of picric acid found in the lab.
- START continues to air monitoring inside the buildings of the Site and is also started collecting particulate samples using a Data Ram. Levels for particulates fell below action levels.
- Several areas of the Site were screened with XRF during this reporting period:
- Soil behind building 3 leading up to the drainage pathway = Below RALs
- Materials collected in the blending room floor = values ranged from 2,300 to over 7,000 ppm for As
- The slope leading from the building to the creek was tested to determine depth of contamination; values began to fall below RALs after 1ft.
- The flattened area near the creek was also screened to determine depth, values began to fall below RALs after 2ft.
- All of the additional Type-C silt fence and rock dams were added to the southern slope to prevent sediment runoff to the creek.
- START has hazard categorized nearly 560 containers of materials onsite to date. This information is being used to develop bulking schemes. The following are the waste streams created at the Site to date: Acids, Bases, Neutrals, Acid-Chlorides, Acid oxidizer chlorides, Biodiesel, Neutral Chlorides, Acid oxidizer rinse, flammables,base solids, and acid solids. A household hazardous waste stream is also being created.
- The floor of the blending room of building 1 also collapsed into the lean-to area during this reporting period. Since hazardous materials still remain on the floor a catch pond was put in outside the building to prevent any runoff from leaving the building and entering the creek. The room is physically unsafe to work in and will be addressed during the demolition phase of the project.
- Additional rock was brought in to temporarily cap areas of soil with high levels of arsenic. Once excavation reaches those areas the rock will be removed and the soil excavated.
- Security at the Site continues to be conducted by the Anderson County Sheriff's Department.
Other Activities Involving the Site:
- USEPA and USACE met twice during this reporting period to discuss the creek cleanup strategy.
- DHEC visited the Site to discuss sampling.
- USEPA ERT visited the Site to discuss the creek cleanup strategy as well.
The owner of the Site has been identified and stated to the OSC that he does not have the financial means to cleanup the Site. Further enforcement activities have begun. Should a viable PRP be identified they will be given the opportunity to assume the cleanup efforts from EPA.
2.1.4 Progress Metrics
Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.2 Planning Section
|
|
|
2.2.1 Anticipated Activities
2.2.1.1 Planned Response Activities
The Site is very complex and will require several phases. The primary phase of the initial response is to stop releases from the Site to the creeks and into Lake Hartwell and to secure any containers that are posing a threat of release. During the next reporting period it it expected that excavation and stockpiling of contaminated soils, bulking of materials from unsecured containers into secure containers, and hazard categorization of containers onsite will continue.
2.2.1.2 Next Steps
- Excavation and stockpiling of contaminated soils
- Bulking of materials into secured containers
- Transferring contents of unsecured containers into secured containers
- Continue hazard categorization of containers onsite
2.2.2 Issues
The main concern at the Site is the nature of the containers. Many of the are mislabeled and in poor condition. In addition, there is a high presence by the local emergency services community due to the presence of explosive materials and other high hazard items. EPA will need to work closely with local, state, and county officials throughout the cleanup process.
|
|
2.3 Logistics Section
|
|
|
No information available at this time.
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
No information available at this time.
|
3. Participating Entities
|
|
3.1 Unified Command
3.2 Cooperating Agencies The following Agencies are Cooperating in the cleanup:
South Carolina Department of Health and Environmental Control
Anderson County Fire Department
Anderson County Sheriff's Office
Anderson County Emergency Services Department
United States Army Corps of Engineers
|
4. Personnel On Site
|
|
Maximum on-site personnel for reporting period:
USEPA OSC - 1
ERRS (ER) - 7
START (Otie) - 2
DHEC -4
US Army Corps of Engineers - 1
|
5. Definition of Terms
|
|
ACM - Asbestos Containing Material
EPA - Environmental Protection Agency
EPM - Enforcement Project Manager
ERRB - Emergency Response and Removal Branch
ERRS - Emergency and Rapid Response Services
ERT - Environmental Response Team
MCL - Maximum Contaminant Level
OSC - On Scene Coordinator
PCB - Polychlorinated biphenal
PPE - Personal Protective Equipment
PRP - Potentially Responsible Party
RAL - Removal Action Level
RSE - Removal Site Evaluation
RSL - Removal Screening Level
RFQ - Request For Quote
SCDHEC - South Carolina Department of Health and Environmental Control
START - Superfund Technical Assessment and Response Team
USACE - United Stated Army Corps of Engineers
XRF - X-Ray Fluorescence
|
6. Additional sources of information
|
|
No information available at this time.
|
7. Situational Reference Materials
|
|