On the afternoon of 18 March 2008, EPA OSC Eric Delgado, EPA OSC Jon Rinehart, and START contractors arrived on-site to perform an emergency removal assessment of the site. EPA OSCs met on-site with TCEQ representatives to collect information regarding the facility’s history and the nature and extent of the release. A subsequent visual inspection of the site was conducted.
The exterior of the facility building showed signs of heavy deterioration with open drainage pathways allowing for offsite migration of contaminants. Stained soils were visible around the perimeter of the building. During the course of the investigation, EPA observed vehicle and pedestrian traffic including small children in the shopping center and roads adjacent to the facility. Due to the degree of deterioration and ease of egress, it can be concluded that the site is unsecured.