EPA has released the Quality Assurance Project Plan (QAPP) for the December, 2013, sampling event of the Francis Street Assessment to evaluate potential releases from Seven Out Tank to the local surface water drainage pathway. This QAPP effectively serves as a short form Sampling and Analysis Plan (SAP).
The document is available at the documents section of the http://www.epaosc.org/sevenout webpage.
Sampling will be conducted over a period of two days during the week of December 16, 2013.