File Name
Category
Uploaded
0001-1505-05 Blacktail Creek Removal Assessment Report-FinalAll.pdf
Final Removal Assessment Report from START dated April 27, 2015
START Report
4/29/2015
50969 KB
Download
20150414_Summit Midstream Daily Activity_Report.pdf
Summit Midstream Daily Activity Report. April 14, 2015.
Report
4/16/2015
722 KB
Download
20150410_Summit Midstream Daily Activity_Report.pdf
Summit Midstream Daily Activity Report. April 10, 2015.
Report
4/16/2015
824 KB
Download
START_Blacktail_ResultsFinal.xlsx
Final validated START water and sediment sampling results.
Data
4/14/2015
29 KB
Download
njos2_well_sample_results_final.pdf
Stantec Well Sampling Preliminary Results_13530 68th St NW, Williston ND (January 19, 2015)
Data
4/13/2015
1622 KB
Download
njos1_results_final 2.pdf
Stantec Well Sampling Preliminary Results_13446 68th St NW, Williston ND (January 19, 2015)
Data
4/13/2015
1115 KB
Download
0002-1502-01 Blacktail Creek Oil Trip Report Final 4-7-15.pdf
Final Report from START dated April 7, 2015
START Report
4/9/2015
4741 KB
Download
2015.04.06 - Control Measures Map.PDF
STANTEC Control Measures Map from April 4, 2015
Map
4/9/2015
608 KB
Download
2015.03.15_Operations Site Map.pdf
STANTEC Operations Site Map from March 14, 2015
Map
4/9/2015
516 KB
Download
2015.02.17_Operations Site Map.pdf
STANTEC Operations Site Map from February 16, 2015
Map
4/9/2015
529 KB
Download
Stantec_GroundwaterDetections_All.xlsx
Responsible Party Ground Water Results_Detections only.
Data
3/11/2015
23 KB
Download
Stantec_SurfaceWaterDetections_All.xlsx
Responsible Party Surface Water Results_Detections only.
Data
3/11/2015
62 KB
Download
Little Muddy River Sampling 0109-10-2015.xlsx
ND DOH Water Sampling and Monitoring Report
ND DOH Report
1/27/2015
16 KB
Download
rptOilFieldSpillSummary1_OilGas.pdf
ND DOH Incident Report and Spill Summary
ND DOH Report
1/27/2015
77 KB
Download