U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Troy Mills

Images

All Images [50]
Categories
Site Investigation<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Road construction for site activities<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Constructed road<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Wetland protection measures<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Construction of liner pad for waste segregation and consolidation<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Construction of liner pad for waste segregation and consolidation<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Constructed liner pad<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of buried drums under the fabric and soil overburden<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Excavation process of buried drums<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Clearing the overburden cover to unearth buried drums<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of open excavation with drums and fabric/soil overburden<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of buried drums<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of grappler handling drum from excavation<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Drum punch used to empty drums<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of drum emptied into containers after opened with drum punch<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of drum contents being consolidated<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of drum content being consolidated<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of drum content being consolidated<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Liquid drum content in left tank and sludge content  in the right tank<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of excavation (buried drums and segregated contaminated soil)<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of sludge being solidified with saw dust for transport<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of empty drums being shredded.  Shreds are added to sludge waste stream<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of contaminated soil stockpiled for transport to disposal facility<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of pad being constructed for sludge to be solidified with saw dust<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of solidified sludge pile ready to be transported to disposal facility<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Sludge with saw dust  solidification process<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Addition of saw dust to sludge for transport<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of empty drums ready to be shredded for volume reduction<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Loading of truck to transport waste to disposal facility<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of liner pad deconstruction<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of former liner pad location<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Additional well installation after completion of drum removal activities<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Regrading/capping of the upper landfill area after drums have been removed<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Upper landfill regrading/capping process<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Upper landfill regrading/capping process<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of the completed cap of the upper landfill<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of lower landfill area during initial stages of drum excavation<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of lower landfill area during initial stages of drum excavation<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of regarding/capping activities of lower landfill area  after drum excavation<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of regarding/capping activities of lower landfill area  after drum excavation<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of regarding/capping activities of lower landfill area  after drum excavation<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of completed cap of lower drum area<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Original culvert that is to be repaced with 36" culvert<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Original culvert<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Newly constructed 36" culvert<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of LNAPL removal activities<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Closeup view of LNAPL removal activities<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags: