Pilsen Soil OU1 Railroad Spur and Alley Site

Images

All Images [32]
Categories
Area 5 asphalt cover. <br />Date Taken: 6/9/2016<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Areas 1 east and Area 2 asphalt cover complete. <br />Date Taken: 7/8/2016<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Area 6 and 7 asphalt cover complete. <br />Date Taken: 6/27/2016<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Area 10 asphalt cover complete.<br />Date Taken: 6/27/2016<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Paving Work Area 2 and Area 1 east.<br />Date Taken: 6/21/2016<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Paving work in Area 2.<br />Date Taken: 6/21/2016<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Area 4 asphalt cover and fence installed complete. <br />Date Taken: 7/8/2016<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Traffic bollards installed (complete) in Area 2. <br />Date Taken: 7/8/2016<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Completed asphalt cap in Areas 8 and 9 (looking west).<br />Date Taken: 5/20/2016<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Chicago DOT paving work crews laying down asphalt to Area 7<br />Date Taken: 5/20/2016<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Area 8 soil being loaded for disposal offsite at a solid waste landfill<br />Date Taken: 12/29/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Final subgrade gravel preparation in Area 8 west end. <br />Date Taken: 12/22/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Geotextile installation in Area 8. <br />Date Taken: 12/22/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
H.Kramer contactors setting up water pump in Area 8 to removed ponded water in excavation. <br />Date Taken: 12/21/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Excavation activities in Area 8<br />Date Taken: 12/21/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
H. Kramer contractors laying down initial gravel layer in Area 8 excavation. <br />Date Taken: 12/23/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
H.Kramer contractors conducting subgrading operations in Areas 6 & 7. <br />Date Taken: 12/17/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
H. Kramer contractors excavating treated TCLP Lead soil in Area 8. <br />Date Taken: 12/18/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
H. Kramer contractors removing concrete slabs in Area 6 as part of grading operations. <br />Date Taken: 12/15/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
H.Kramer contractors collecting soil excavated from Area 1 for offsite transport to Solid Waste Landfill. <br />Date Taken: 12/14/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
BNSF collecting rails for off-site recycling. <br />Date Taken: 12/14/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Area 10 gravel grading activities. <br />Date Taken: 12/11/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Area 2 and Area 1 east areas with completed grading work.<br />Date Taken: 12/10/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Area 2 Grading activities. Orange geotextile underlaying the gravel is visible.   <br />Date Taken: 12/9/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Area1 West. Final Cover Complete.<br />Date Taken: 12/10/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Area 1 view (looking west) of excavation of soil.<br />Date Taken: 12/4/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Soil excavation in Area 1<br />Date Taken: 12/3/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Removal of vegetation and garbage in Area 2. <br />Date Taken: 12/1/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Abandoned telephone removal in Area 1<br />Date Taken: 12/1/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
EPA OSC observing Rail Tie removal with BNSF and GHD (H. Kramer) contractor. EPA air monitor is in Foreground.<br />Date Taken: 11/19/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Rail Cutting (for removal) operations Area 4<br />Date Taken: 11/17/2015<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Pilsen Soil OU1 Site Areas 1 to 10 figure<br />Date Taken: 11/19/2015<br />Category: Site Figure<br />Latitude: <br />Longitude: <br />Tags: