U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Crest Rubber Alliance

Images

All Images [48]
Categories
Western Exterior Wall of Warehouse Building. Alliance Rubber Co Sign. Taken during OEPA Site Assessment.<br />Date Taken: 11/15/2016<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: Assessment, OEPA
Process Building Roof Collapse. <br />Date Taken: 11/15/2016<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: Assessment
Process Building Interior. Alliance FD Referral Photo<br />Date Taken: 10/21/2016<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: AFD
Southern end of south warehouse building<br />Date Taken: 5/15/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
South at front of Warehouse on N. Park Ave. <br />Date Taken: 5/15/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
Metal machines in southern bay, processing building<br />Date Taken: 5/15/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
Equipment storage west wall of garage building<br />Date Taken: 5/15/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
Northern entrance to site<br />Date Taken: 5/15/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
North Along N. Park Ave<br />Date Taken: 5/15/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
Treeline behind EPA and EPA contractor trailer<br />Date Taken: 5/15/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
West side of southern warehouse building and courtyard area<br />Date Taken: 5/15/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
NE corner of process building<br />Date Taken: 5/15/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
Pipe leading out of south wall of process building<br />Date Taken: 5/15/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
Rock placed on northern lot of site<br />Date Taken: 5/17/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
Rock placed on northern lot of site<br />Date Taken: 5/17/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
DustTrack placed at southwest corner of process building<br />Date Taken: 5/17/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
EPA contractors clearing and grubbing site<br />Date Taken: 5/17/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
DustTrak placed near southern portion of the site during debris moving activities<br />Date Taken: 5/17/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
EPA contractors clearing and grubbing site<br />Date Taken: 5/17/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
Debris cleared from east side of process building<br />Date Taken: 5/18/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
Clearing and grubbing activities<br />Date Taken: 5/18/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
Clearing from in front of bay door, process building<br />Date Taken: 5/18/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
Clearing area south of southern warehouse building<br />Date Taken: 5/18/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
Cleared area east of garage building<br />Date Taken: 5/18/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
Rolloffs at front of warehouse building for scrap and debris<br />Date Taken: 5/18/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
EPA contractor moving equipment from courtyard area<br />Date Taken: 5/18/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
Containers in open pit in warehouse building<br />Date Taken: 5/18/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
Shelves of scrap rubber in northern portion of warehouse<br />Date Taken: 5/22/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
Looking east from Union St. at west entrance of site<br />Date Taken: 5/22/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
View of warehouse from western entrance<br />Date Taken: 5/22/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
View of southern portion of warehouse from west garage door entrance <br />Date Taken: 5/22/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
Southern portion of warehouse in process of being cleared of debris and reorganized<br />Date Taken: 6/5/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
Area of process building impacted with spilled chemicals being cleaned by EPA contractors <br />Date Taken: 6/6/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
Containers staged in southern portion of warehouse<br />Date Taken: 6/6/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
Containers staged in southern portion of warehouse<br />Date Taken: 6/6/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
EPA contractors collecting a solid sample from a damaged 55 gallon poly drum while the Coast Guard AST performs air monitoring<br />Date Taken: 6/8/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
Shoring construction in the process building<br />Date Taken: 6/8/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
South portion of the warehouse and intended staging area for containers<br />Date Taken: 6/9/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
EPA contractor moving bulk solids from the process building to be staged in the warehouse<br />Date Taken: 6/9/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
EPA contractor staging bulk solids in the warehouse for disposal<br />Date Taken: 6/12/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
EPA contractor placing bulk solids in a roll off dumpster for offsite disposal<br />Date Taken: 6/13/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
EPA contractor sampling a container of solids<br />Date Taken: 6/13/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
EPA contractors securing a roll off to be transported offsite<br />Date Taken: 6/14/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
EPA contractors securing drums to be removed from the process building and staged in the warehouse<br />Date Taken: 6/16/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
EPA contractors securing drums to be removed from the process building and be staged in the warehouse<br />Date Taken: 6/16/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
EPA contractors segregating small containers for disposal or waste categorization sampling.<br />Date Taken: 6/20/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
EPA contractors secure drums to be removed from process building and staged in the warehouse.<br />Date Taken: 6/20/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags:
EPA contractors remove drums from the process building to be staged in the warehouse.  <br />Date Taken: 6/20/2017<br />Category: Site Photo<br />Latitude: 40.9274319<br />Longitude: -81.1053598<br />Tags: