Vo-Toys

Images

All Images [182]
Categories
<<  <  1 2 3 4 5  ...  >  >> 
Building B - Roof ACM removal<br />Date Taken: 9/13/2021<br />Category: Site Photo<br />Latitude: 40.7435916666667<br />Longitude: -74.1528638888889<br />Tags:
Building B - Roof ACM abatement<br />Date Taken: 9/13/2021<br />Category: Site Photo<br />Latitude: 40.7435194444444<br />Longitude: -74.1529777777778<br />Tags:
Building B - Window removal<br />Date Taken: 9/9/2021<br />Category: Site Photo<br />Latitude: 40.7433194444444<br />Longitude: -74.1519694444444<br />Tags:
Building B - First floor cushion material installation<br />Date Taken: 8/23/2021<br />Category: Site Photo<br />Latitude: 40.7436527777778<br />Longitude: -74.1528388888889<br />Tags:
Building A - Roof ACM removal<br />Date Taken: 8/16/2021<br />Category: Site Photo<br />Latitude: 40.7439<br />Longitude: -74.152275<br />Tags:
Building B - second floor mercury hotspot removal<br />Date Taken: 8/10/2021<br />Category: Site Photo<br />Latitude: 40.7434666666667<br />Longitude: -74.1526027777778<br />Tags:
Building A - roof ACM removal<br />Date Taken: 8/4/2021<br />Category: Site Photo<br />Latitude: 40.7439222222222<br />Longitude: -74.1528555555556<br />Tags:
Building B - First floor window removal<br />Date Taken: 8/30/2021<br />Category: Site Photo<br />Latitude: 40.7437333333333<br />Longitude: -74.1520611111111<br />Tags:
Building B - First floor window removal<br />Date Taken: 8/30/2021<br />Category: Site Photo<br />Latitude: 40.7436833333333<br />Longitude: -74.1520777777778<br />Tags:
Building B - First floor window removal<br />Date Taken: 8/30/2021<br />Category: Site Photo<br />Latitude: 40.7434055555556<br />Longitude: -74.1530527777778<br />Tags:
Building B - First floor window removal<br />Date Taken: 8/30/2021<br />Category: Site Photo<br />Latitude: 40.7432972222222<br />Longitude: -74.1524972222222<br />Tags:
Building B - First floor cushion material<br />Date Taken: 8/25/2021<br />Category: Site Photo<br />Latitude: 40.7433972222222<br />Longitude: -74.1531666666667<br />Tags:
Building A - second floor removal<br />Date Taken: 7/20/2021<br />Category: Site Photo<br />Latitude: 40.7438694444444<br />Longitude: -74.1535638888889<br />Tags:
Building A - Second floor removal<br />Date Taken: 7/20/2021<br />Category: Site Photo<br />Latitude: 40.7439611111111<br />Longitude: -74.1536027777778<br />Tags:
Building A - Third Floor, mercury recovery <br />Date Taken: 7/20/2021<br />Category: Site Photo<br />Latitude: 40.7436944444444<br />Longitude: -74.1526861111111<br />Tags:
Building A - Third floor, sub floor removal<br />Date Taken: 7/20/2021<br />Category: Site Photo<br />Latitude: 40.7440722222222<br />Longitude: -74.1526805555556<br />Tags:
Building A - Third floor, flooring removal<br />Date Taken: 7/20/2021<br />Category: Site Photo<br />Latitude: 40.7438916666667<br />Longitude: -74.1522305555556<br />Tags:
Building A - Third Floor elemental mercury<br />Date Taken: 7/20/2021<br />Category: Site Photo<br />Latitude: 40.7440555555556<br />Longitude: -74.1525722222222<br />Tags:
Building A - Third floor elemental mecury<br />Date Taken: <br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Building B - post removal washdown<br />Date Taken: 8/2/2021<br />Category: Site Photo<br />Latitude: 40.7435111111111<br />Longitude: -74.1523361111111<br />Tags: