Havertown PCP NPL Site

All Images [67]
Categories
<<  <  1 2 3 4  >  >> 
Core Drilling the road to check utilities before drilling horizontally under it. <br />Date Taken: <br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Injecting soap to see if oil can be recovered easily <br />Date Taken: <br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Drillers set up to pull the pipes. under the YMCA parking lot.<br />Date Taken: <br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Bore hole under the YMCA parking lot.<br />Date Taken: <br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Under-rimming attachment to expand initial bore hole under YMCA parking lot.<br />Date Taken: <br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Location of new vault for new force main.<br />Date Taken: 5/27/2020<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Directional Drilling Equipment.<br />Date Taken: 5/26/2020<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Installation of a lateral line from header into home.<br />Date Taken: 5/4/2020<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Installation of a lateral pipe from header line into home.<br />Date Taken: 5/4/2020<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Installation of a "lateral," which will connect the basement pump to a header line.<br />Date Taken: <br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Deep collection manhole. Header line from both sides discharge into the manhole.<br />Date Taken: 5/5/2020<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Slope by CTR after tree removal. <br />Date Taken: 4/29/2020<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Excavation filled with stone at the edge of a driveway to act as a French drain to mitigate constant ponding of water.<br />Date Taken: 4/29/2020<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Installation of the deep collection sump.<br />Date Taken: 4/29/2020<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Header Line installation.<br />Date Taken: 5/5/2020<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Deep collection sump, where the header line will discharge.<br />Date Taken: 5/5/2020<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Straw mat placed on soil after backfilling.<br />Date Taken: 4/15/2020<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Header line installation.<br />Date Taken: 4/6/2020<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Start of the header line installation.<br />Date Taken: 4/6/2020<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Wells installation at the YMCA parking lot.<br />Date Taken: 3/24/2020<br />Category: Site Photo<br />Latitude: 39.9838367489501<br />Longitude: -75.3174269199371<br />Tags: