U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Halaco Engineering

Images

All Images [67]
Categories
<<  <  1 2 3 4  >  >> 
A historical picture of Halaco while in operation.  Year unknown.  Note the liquid in the ponds in the WMU.<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
The WMU looking from the Ormond Beach Lagoon<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
The south eastern end of the facility looking southwest.<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Northern end of the smelter<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
EPA Contractors collecting samples on the WMU.<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
The mechanics shop<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
A drum of sulfuric acid in the mechanics shop<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
The chemical storage inside the mechanics shop.<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Maintanence chemical storage.<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
A drum of sodium hydroxide in the mechanics shop.<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Process waste solids stored in the smelter.<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
The EPA Office of Radiation and Indoor Air' Enhance Radiation Ground Surveyor conducting a gamma radiation survey in northern WMU<br />Date Taken: 6/19/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
The EPA START Team setting up an air surveillance station on the WMU during the Integrated Assessment<br />Date Taken: 6/20/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
An air surveillance station inside the smelter during the Integrated Assessment.<br />Date Taken: 6/20/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Installation of a groundwater well east of the pile during the Integrated Assessment<br />Date Taken: 6/20/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
The EPA Geoprobe collected soil and groundwater samples during the Integrated Assessment<br />Date Taken: 6/20/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Collection of sediment samples in the Oxnard Industrial Drain during the Integrated Assessment<br />Date Taken: 6/23/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Excavation of an access road on the southern toe of the WMU<br />Date Taken: 2/9/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Installation of the 3:1 grade on the southern slope of the WMU<br />Date Taken: 2/9/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags: