Precision National Plating Site

All Images [8]
Categories
Remote Hydrogen Sulfide Monitoring Station (Arch Ave)<br />Date Taken: 8/12/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Remote Hydrogen Sulfide Monitoring Station (Arch Ave) (Inside View)<br />Date Taken: 8/12/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Calcium Polysulfide Tank and manifolds directing flow to injection wells.<br />Date Taken: 9/30/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Gages in trailer showing pressures in injection lines.<br />Date Taken: 9/30/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Flow meters showing injection rates into each well.<br />Date Taken: 9/30/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Color-coded lines to Injection Wells.<br />Date Taken: 9/30/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Four of 17 Injection Wells.<br />Date Taken: 9/30/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Closeup of one injection well.<br />Date Taken: 9/30/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags: