U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Ashton Texaco Oil Release

Images

All Images [40]
Categories
Location of MW3<br />Date Taken: 5/30/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Location of 12,000-gal UST<br />Date Taken: 5/29/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Northwest Corner of Site<br />Date Taken: 5/29/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Drainage Ditch located north of the site<br />Date Taken: 5/28/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Collecting sample from drainage ditch<br />Date Taken: 5/29/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
START collecting sample<br />Date Taken: 5/28/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Photograph of BTEX peaks from groundwater sample<br />Date Taken: 5/28/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
START chemist operating field gas chromatograph/ mass spectrometer<br />Date Taken: 5/28/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Gasoline removed from monitoring well #3<br />Date Taken: 6/20/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Drillers drilling EPA MW-9 located west side of pump island<br />Date Taken: 6/19/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Wheeler Tank testing retesting the 12,000 gallon UST<br />Date Taken: 6/18/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Lane Drilling using air rotary hammer to drill extraction wells<br />Date Taken: 6/21/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Trench outline leading to MW 09<br />Date Taken: 8/5/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Trench outline leading to MW 15<br />Date Taken: 8/5/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
ERRS cutting asphalt prior to digging trench line<br />Date Taken: 8/5/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
ERRS cutting asphalt in preparation of trench digging<br />Date Taken: 8/5/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
ERRS excavating near MW-15<br />Date Taken: 8/6/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
ERRS excavating trench near MW-9<br />Date Taken: 8/5/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
ERRS jackhammering outcrop of Basalt above the 4 foot line<br />Date Taken: 8/6/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Photograph of the blasting cap unearthed in the trench<br />Date Taken: 8/6/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: 8/8/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: 8/9/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
ERRS laying pipe near MW-10<br />Date Taken: 8/9/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Treatment system pipes along with old vapor extraction lines<br />Date Taken: 8/9/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
ERRS installing pipe near MW-9<br />Date Taken: 8/9/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Backfilling of Trench<br />Date Taken: 8/13/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Well Vault Construction at MW-10<br />Date Taken: 8/14/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Wll Vault Construction at MW-09 A<br />Date Taken: 8/14/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Well Vault Construction at MW-09 B<br />Date Taken: 8/14/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
System Test Run at MW-10 - Pumping Product<br />Date Taken: 8/15/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
AST with Product Tubing A<br />Date Taken: 8/21/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
AST with Product Tubing B<br />Date Taken: 8/21/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
AST with Uncompleted Fence<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
AST with Completed Fence<br />Date Taken: 8/22/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
AST with Fence and MW-09<br />Date Taken: 8/22/2003<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags: