U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Brandt Pike Terminal Site

Images

All Images [22]
Categories
Brandt Pike Terminal<br />Date Taken: 11/1/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Brandt Pike Terminal<br />Date Taken: 11/1/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Brandt Pike Storage Tanks<br />Date Taken: 11/1/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Brandt Pike Storage Tanks<br />Date Taken: 11/1/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Brandt Pike Terminal on-site groundwater treatment unit<br />Date Taken: 11/1/2006<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of SLOP tank adjacent to Tank #6.  This is the tank that overflowed with Jet-A fuel<br />Date Taken: 1/21/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of 9,500 gallon Jet-A fuel spill area<br />Date Taken: 1/21/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of 9,500 gallon Jet-A fuel spill area<br />Date Taken: 1/21/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of 9,500 gallon Jet-A fuel spill area<br />Date Taken: 1/21/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of BP contractors excavating contaminated soil<br />Date Taken: 1/23/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View BP contractors excavating contaminated soil<br />Date Taken: 1/23/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Area of excavation<br />Date Taken: 1/23/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of the installation of one of four recovery wells<br />Date Taken: 1/24/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Installation of a recovery well<br />Date Taken: 1/24/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Brandt Pike Terminal<br />Date Taken: 1/25/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Brandt Pike Terminal<br />Date Taken: 1/25/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of vertical profile well VP-09<br />Date Taken: 8/26/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View of vertical profile water samples being collected<br />Date Taken: 8/26/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Respondent's contractor installing new groundwater monitoring well WVP-02<br />Date Taken: 3/24/2009<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Installing WVP-02<br />Date Taken: 3/24/2009<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
View looking east onto Citgo property from WVP-02<br />Date Taken: 3/24/2009<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Using PID to check soil boring cuttings for VOCs<br />Date Taken: 3/24/2009<br />Category: <br />Latitude: <br />Longitude: <br />Tags: