U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Saginaw River Sediment Dioxin Contamination Site (Wickes Park)

Images

All Images [34]
Categories
Additional sediment hot spot delineation sampling activity.<br />Date Taken: 11/19/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Sediment core - sample number SEDA-01A-L0079.<br />Date Taken: 11/15/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Sample collection procedure from sediment sample core.<br />Date Taken: 11/15/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Hot spot delineation sediment sampling activities.<br />Date Taken: 11/15/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Wickes Park dock area.<br />Date Taken: 11/15/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Overview of the river and shoreline.<br />Date Taken: 11/28/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Buoys in the river mark the proposed dredging area.<br />Date Taken: 11/28/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Southwest view of current site setup operations<br />Date Taken: 11/28/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Southwest view of current site setup operations.<br />Date Taken: 11/28/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Southwest view of current site setup operations.<br />Date Taken: 11/28/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
These signs are posted on the fence surrounding the site.<br />Date Taken: 11/28/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Pre-existing DNR sign.  The sign is located right at the sites entry point.  The sign might be confusing to the general public as to want is going on and who doing the work.<br />Date Taken: 11/28/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Overview of site waterfront looking north.<br />Date Taken: 11/28/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Concrete anchors that will be used to anchor the barge in the middle of the river.<br />Date Taken: 11/29/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
USCG approved lighting on the barge.<br />Date Taken: 11/29/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Diver finishing up some surveying of the perimeter of the proposed dredge area.<br />Date Taken: 11/30/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Off loading and setup of the dewatering system.<br />Date Taken: 11/30/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Setup of the dewatering system<br />Date Taken: 11/30/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Setup of the bag and cartridge filter section of the water treatment process.<br />Date Taken: 11/30/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Barge anchored in position on the southern edge of the proposed dredge area.<br />Date Taken: 11/30/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
River completely frozen over with approximately 2" of ice.<br />Date Taken: 12/1/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Setup of the sump that will be used to collect drainage from the containment pad and pump the water back to the water treatment process.<br />Date Taken: 12/1/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Barge iced in next to shoreline.<br />Date Taken: 12/1/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Setup of the dewatering system and conveyor system.<br />Date Taken: 12/1/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Ice broken up with the use of a work skiff.  Barge being anchored into postion on the southern end of the dredge area.<br />Date Taken: 12/2/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Dow contractors in process of demobilizing equipment and sediment treatment infrastructure<br />Date Taken: 12/26/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Dow contractors involved with with demobilization activities<br />Date Taken: 12/28/2007<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
General view of treatment site with majority of equipment removed<br />Date Taken: 1/2/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Dow contractors utilizing high pressure wash methods to throughly remove risidual materials from treatment area<br />Date Taken: 1/7/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Dow contractors in process of high pressure wash activities in former treatment area<br />Date Taken: 1/7/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
by product materials from treatment area collected from Dow contractors high pressure wash activities waiting for transport to Dow's Salburg Landfill<br />Date Taken: 1/7/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
General view of treatment area after power wash activities<br />Date Taken: 1/7/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Contractors utilizing 'parking lot sweeper' over entire asphalt project area<br />Date Taken: 1/7/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Contractors emptying frac tank that collected water from power washing activities; water transferred to Dow's waste water treatment plant<br />Date Taken: 1/8/2008<br />Category: <br />Latitude: <br />Longitude: <br />Tags: