U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Forshaw Chemical Site

Images

All Images [23]
Categories
Black powder uncovered while excavating treatment cell<br />Date Taken: 10/21/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
treatment cell excavation<br />Date Taken: 10/21/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
treatment cell liners complete install<br />Date Taken: 10/22/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Treatment cell with first liner and sand<br />Date Taken: 10/22/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Brick wall and concrete behind it at contaminated soil excavation<br />Date Taken: 10/22/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Contaminated soil excavation area preperation (most of the concrete is removed).<br />Date Taken: 10/26/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
PCP contamination and storm sewer pipe<br />Date Taken: 10/28/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Area 1 excavation<br />Date Taken: 10/28/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Sewer line break<br />Date Taken: 10/29/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Temporary sewer line pipe to prevent contact with contaminated soils<br />Date Taken: 10/30/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Soil screener moving screening soil into the treatment cell<br />Date Taken: 10/30/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Permanant sewer line repair<br />Date Taken: 11/5/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Area 2 excavation<br />Date Taken: 11/6/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Oil water seperator abandoned in place with concrete<br />Date Taken: 11/9/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Storm drain flushing. Left pipe.<br />Date Taken: 11/10/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Vac truck during storm drain flush.<br />Date Taken: 11/10/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Continued excavation of area 1 to the north after first round of confirmation sampling indicates PCP concentrations still above RAL<br />Date Taken: 11/19/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Second round excavation in area 1<br />Date Taken: 11/20/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Completion of additional excavation in area 1<br />Date Taken: 11/20/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Treatment cell after backfill of excavation.<br />Date Taken: 1/12/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Paving of excavation of area 1 and 2.<br />Date Taken: 1/12/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Site after restoration.<br />Date Taken: 1/12/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Area 2<br />Date Taken: 1/12/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: