U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Northwest Pipe and Casing

Images

All Images [92]
Categories
<<  <  1 2 3 4 5  >  >> 
Northwest Pipe and Casing site prior to start of test pit excavations.<br />Date Taken: 8/12/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Excavating test pit<br />Date Taken: 8/12/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Digging test pit<br />Date Taken: 8/12/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Pipe from previous site buildings found in a test pit.<br />Date Taken: 8/13/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Clearing support area for second office trailer.<br />Date Taken: 9/1/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Second office trailer placed on site.<br />Date Taken: 9/3/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Dry wheel wash between contaminated area and support zone. <br />Date Taken: 9/8/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Removal of two foot soil cap from Excavation Area #1.<br />Date Taken: 9/3/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Stockpile of clean soil cap from Excavation Area #1.<br />Date Taken: 9/3/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
base of containment cells<br />Date Taken: 9/4/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
lining containment cells<br />Date Taken: 9/10/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Creating containment cells - 18 inches deep in clean cap with higher sides berms for containment of contamianted soil. Lined with reinforced sheet plastic, geofabric and gravel.<br />Date Taken: 9/8/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
starting to remove overburden from excavation area 1<br />Date Taken: 9/10/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Starting excavation of first shoring bay; Dataram for fugitive dust detection in foreground.<br />Date Taken: 9/12/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Installing slide shoring in bay 1. <br />Date Taken: 9/14/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
On-Site Groundwater Treatment System<br />Date Taken: 9/10/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Water treatment system<br />Date Taken: 9/28/2008<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Groundwater treatment system components: pump, sand filters, bag filters, controller<br />Date Taken: 9/12/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Filling Carbon Filters of Water Treatment system with Granular Activated Carbon (GAC).<br />Date Taken: 9/10/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Discharge line to water treatement system under site road to pump next to excavation bay 1.<br />Date Taken: 9/12/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: