The fomer Karnish Radium Dial Facility Site (1147 East 31st Street South, Wichita, KS). Building is currently occupied by EBY Construction.<br />Date Taken: 4/14/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Setting up for the removal action<br />Date Taken: 10/5/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
START personnel conducting air monitoring.<br />Date Taken: 10/5/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
ERRS personnel conducting the removal action.<br />Date Taken: 10/5/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Dust suppression technology applied to keep the soil from migrating from the area.<br />Date Taken: 10/5/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Excavating the contaminated soil.<br />Date Taken: 10/5/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Excavating the contaminated soil. Preparing to load the soil into the loader for disposal at US Ecology.<br />Date Taken: 10/6/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Excavating the contaminated soil. Preparing to load the soil into the loader for disposal at US Ecology.<br />Date Taken: 10/6/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
EPA & START personnel conducting the MARRSIM sampling process to determine if all of the contaminated soil was / is removed from the Site.<br />Date Taken: 10/6/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Filling in the excavation pits dug, by the track-hoe, with clean rock, soil, and asphalt. <br />Date Taken: 10/6/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
ERRS personnel putting the finishing touches of gravel on the Site.<br />Date Taken: 10/6/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Karnish removal action completed. Site was returned to its original condition after the removal action. Facility parking lot returned back to use on 10/07/2010.<br />Date Taken: 10/6/2010<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: