Villa Mobile Home Park Battery Dump Site

Images

All Images [44]
Categories
<<  <  1 2 3  >  >> 
looking west towards the intersection of venice and verona<br />Date Taken: 3/15/2013<br />Category: Site Photo<br />Latitude: 35.4858333333333<br />Longitude: -80.6071666666667<br />Tags:
looking south from verona st<br />Date Taken: 3/15/2013<br />Category: Site Photo<br />Latitude: 35.4855<br />Longitude: -80.6088333333333<br />Tags:
final stream restoration to culvert<br />Date Taken: 3/15/2013<br />Category: Site Photo<br />Latitude: 35.4861666666667<br />Longitude: -80.6083333333333<br />Tags:
Site completion looking southeast<br />Date Taken: 3/15/2013<br />Category: Site Photo<br />Latitude: 35.486<br />Longitude: -80.6078333333333<br />Tags:
Junction box installed, awaiting permanent cover<br />Date Taken: 3/15/2013<br />Category: Site Photo<br />Latitude: 35.486<br />Longitude: -80.6078333333333<br />Tags:
Condition of site upon demobilization on 2/5/13<br />Date Taken: 2/5/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Condition of site upon demobilization on 2/5/13<br />Date Taken: 2/5/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Condition of site upon demobilization on 2/5/13<br />Date Taken: 2/5/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Erosion of backfilled soils due to major storm system that impacted the site during the night of 1/30-1/31<br />Date Taken: 1/31/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Measures taken to direct stormwater and minimize effect of major storm front expected to impact the site on night of 1/30-1/31
<br />Date Taken: 1/30/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Loading flattened ASTs for recycling<br />Date Taken: 1/28/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
McLain Rd where the City of Kannapolis removed headwalls and asphalt and placed hydroseed along the exposed road bed.<br />Date Taken: 1/24/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Erosion at west end of site caused by overland flow of stormater due to blocked inlet at west side of Venice St.<br />Date Taken: 1/22/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Half-collapsed pipe segment at east end of proposed stream restoration. This segment is to be retro-fitted with a headwall inlet to carry stormwater to outfall at McLain Rd.<br />Date Taken: 1/22/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Restored streambed at former location of McLain Rd. Note influx of soils in conduit consistent with sand/gravel from road bed.<br />Date Taken: 1/22/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Restored streambed to east of site at former location of McLain Rd.<br />Date Taken: 1/22/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Removal of AST stormwater pipe from south side of site<br />Date Taken: 1/22/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Blocked upstream inlet to west of Venice St led to over-land flow of stormwater and significant erosion of soils placed in December 2012.<br />Date Taken: 1/22/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Condition of site upon demobilization on 12/7/2012<br />Date Taken: 12/7/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Condition of site upon demobilization on 12/7/2012<br />Date Taken: 12/7/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: