U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Harris-Thomas Industries Site

Images

All Images [40]
Categories
Leaking transformers on the roof.  <br />Date Taken: 2/2/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Stained soil from the transformer spill<br />Date Taken: 2/2/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Stained soil removed on Feb 3 along Harshman Street<br />Date Taken: 2/3/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Stained soil removed along Harshman Street.  Vandalized transformers in the background.<br />Date Taken: 2/3/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Front of site building<br />Date Taken: 2/3/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Dayton Fire Dept Notice on site building<br />Date Taken: 2/3/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
View of site buildings<br />Date Taken: 2/2/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Warrant posted on front door<br />Date Taken: 10/21/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Crew removing transformers from roof<br />Date Taken: 10/25/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Transformer being removed from roof<br />Date Taken: 10/25/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Last of 3 transformers removed from roof<br />Date Taken: 10/25/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Drum containing oil-contaminated rock being removed from roof<br />Date Taken: 10/25/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Transformer being loaded for off-site disposal<br />Date Taken: 10/25/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Support Zone<br />Date Taken: 10/26/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Air monitoring for particulates with DataRAM<br />Date Taken: 10/31/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Cleaned out pit in Building D<br />Date Taken: 10/31/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
WESTON START solar panel and wind turbine<br />Date Taken: 10/31/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Unknown solids in process piping<br />Date Taken: 11/1/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Chrome solids in pit in Building D<br />Date Taken: 11/1/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Cleaning out storm sewer filled with Chrome solid waste<br />Date Taken: 11/2/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Loading of waste into 20-yd roll off for offsite transport and disposal<br />Date Taken: 11/8/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Dayton FD on site to observe removal activities<br />Date Taken: 11/7/2012<br />Category: Site Photo<br />Latitude: 39.7697475<br />Longitude: -84.1699408333333<br />Tags:
Removal of chrome solid waste from pit in Building D<br />Date Taken: 11/14/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Roll-off box filled with chrome solid waste<br />Date Taken: 11/15/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Building A pit liquid<br />Date Taken: 11/16/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
ERRS power washing flooring in Building D<br />Date Taken: 12/3/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
ERRS pumping out neutral liquid from drums into vac truck<br />Date Taken: 11/30/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
ERRS vac truck used to collect decon water from decontamination activities in Building D<br />Date Taken: 12/3/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Loading Clean Waters tanker for off-site disposal<br />Date Taken: 12/20/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Loading Clean Waters tanker for off-site disposal<br />Date Taken: 12/20/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Removing waste liquid from Building B pit<br />Date Taken: 12/20/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Removal of process piping<br />Date Taken: 12/20/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Power washing contamination from the walls of Building B<br />Date Taken: 1/3/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Decontaminating the walls of Building B<br />Date Taken: 1/3/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Lab Pack waste packaged for off-site disposal.<br />Date Taken: 1/11/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Tanker loading 5,000 gallons of waste liquid for off-site disposal.<br />Date Taken: 1/11/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Decon in Building I<br />Date Taken: 1/10/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
ERRS jet cleaning underground stormwater pipes<br />Date Taken: 2/7/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Decon water being collected from frac tank for off-site disposal<br />Date Taken: 2/7/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
EPA giving final site walkthrough<br />Date Taken: 2/11/2013<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: