Henson Creek Mines - Ute Ulay Mine

<<  <  1 2 3 4  >  >> 
Ute Ulay mine and mill waste dump and Henson Creek from the west looking east. <br />Date Taken: 5/30/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags: Waste Dump
Ute Ulay mine and mill waste dump with avalanche that dammed Henson Ck eroding waste into the creek.<br />Date Taken: 12/10/2009<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Lower Tailings Impoundments<br />Date Taken: 5/30/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Upper tailings impoundment<br />Date Taken: 5/30/2012<br />Category: Site Photo<br />Latitude: <br />Longitude: <br />Tags:
Moving the sub-economic ore pile to create a mixing area.<br />Date Taken: 5/24/2013<br />Category: Preparation Work<br />Latitude: <br />Longitude: <br />Tags:
Continued consolidation of sub-economic ore pile with equipment.<br />Date Taken: 5/24/2013<br />Category: Preparation Work<br />Latitude: <br />Longitude: <br />Tags:
Improved and widened access road from Engineer Pass Road.<br />Date Taken: 5/24/2013<br />Category: Preparation Work<br />Latitude: <br />Longitude: <br />Tags:
Flume pipeline and other mining metal remnants awaiting relocation from the tailings impoundment.<br />Date Taken: 5/24/2013<br />Category: Preparation Work<br />Latitude: <br />Longitude: <br />Tags:
Continued consolidation of the waste rock and sub-economic ore to create a work space for mixing.<br />Date Taken: 5/24/2013<br />Category: Preparation Work<br />Latitude: <br />Longitude: <br />Tags:
Creating the mixing pad beneath the former footprint of the sub-economic ore pile.<br />Date Taken: 5/24/2013<br />Category: Preparation Work<br />Latitude: <br />Longitude: <br />Tags:
Ramp from mixing area into the tailings impoundment showing berm to contain site runoff.<br />Date Taken: 5/24/2013<br />Category: Preparation Work<br />Latitude: <br />Longitude: <br />Tags:
Shot of the tailings impoundment slope beneath the flume and cribbings structure.<br />Date Taken: 5/24/2013<br />Category: Preparation Work<br />Latitude: <br />Longitude: <br />Tags:
View looking west along the slope and constructed flume holding back the tailings impoundment.<br />Date Taken: 5/24/2013<br />Category: Preparation Work<br />Latitude: <br />Longitude: <br />Tags:
View of cribbings structure installed to hold back the tailings impoundment.<br />Date Taken: 5/24/2013<br />Category: Preparation Work<br />Latitude: <br />Longitude: <br />Tags:
Another view of the cribbings structure and the bedrock outcrops holding back the tailings impoundment.<br />Date Taken: 5/24/2013<br />Category: Preparation Work<br />Latitude: <br />Longitude: <br />Tags:
Slope and tailings impoundment debris.<br />Date Taken: 5/24/2013<br />Category: Preparation Work<br />Latitude: <br />Longitude: <br />Tags:
View looking east along the tailings impoundment slope.<br />Date Taken: 5/24/2013<br />Category: Preparation Work<br />Latitude: <br />Longitude: <br />Tags:
Cribbings structure holding back the tailings impoundment on the southeast corner.<br />Date Taken: 5/24/2013<br />Category: Preparation Work<br />Latitude: <br />Longitude: <br />Tags:
View of slope, including rock outcrops, beneath the tailings impoundment.<br />Date Taken: 5/24/2013<br />Category: Preparation Work<br />Latitude: <br />Longitude: <br />Tags:
Another view, further down the slope, of the face beneath the tailings impoundment.<br />Date Taken: 5/24/2013<br />Category: Preparation Work<br />Latitude: <br />Longitude: <br />Tags: