U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Highland Plating Fire

Images

All Images [50]
Categories
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: 7/16/2014<br />Category: <br />Latitude: 34.0891444444445<br />Longitude: -118.342291666667<br />Tags:
<br />Date Taken: 7/16/2014<br />Category: <br />Latitude: 34.0892527777778<br />Longitude: -118.342177777778<br />Tags:
<br />Date Taken: 7/16/2014<br />Category: <br />Latitude: 34.0891416666667<br />Longitude: -118.342644444444<br />Tags:
<br />Date Taken: 7/15/2014<br />Category: <br />Latitude: 34.0890166666667<br />Longitude: -118.342613888889<br />Tags:
<br />Date Taken: 7/14/2014<br />Category: <br />Latitude: 34.0893083333333<br />Longitude: -118.342108333333<br />Tags:
<br />Date Taken: 7/15/2014<br />Category: <br />Latitude: 34.0890888888889<br />Longitude: -118.342505555556<br />Tags:
<br />Date Taken: 7/14/2014<br />Category: <br />Latitude: 34.0888222222222<br />Longitude: -118.342422222222<br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Floor drain in breezeway is completely empty.<br />Date Taken: 7/18/2014<br />Category: Stabilization Phase<br />Latitude: 34.089118<br />Longitude: -118.341948<br />Tags:
Sand Bags staged infront of gate to breezeway<br />Date Taken: 7/18/2014<br />Category: Stabilization Phase<br />Latitude: 34.089118<br />Longitude: -118.341948<br />Tags:
Facility secured against trespassers<br />Date Taken: 7/18/2014<br />Category: Stabilization Phase<br />Latitude: 34.089118<br />Longitude: -118.341948<br />Tags:
Contractor secures entrances to building.  This is breezeway entrance on Romaine Street<br />Date Taken: 7/15/2014<br />Category: Stabilization Phase<br />Latitude: 34.089118<br />Longitude: -118.341948<br />Tags:
Easement on Romaine Street after contractor removed top 4-6 inches of soil.<br />Date Taken: 7/15/2014<br />Category: Stabilization Phase<br />Latitude: 34.089118<br />Longitude: -118.341948<br />Tags:
Security fencing on Orange and Romaine to prevent public access to storage tanks.<br />Date Taken: 7/15/2014<br />Category: Stabilization Phase<br />Latitude: 34.089118<br />Longitude: -118.341948<br />Tags:
Large Stoirage tanks staged on Romaine Street.  Tanks contain chemicals and fire suppression fluids collected from street and building.<br />Date Taken: 7/15/2014<br />Category: Stabilization Phase<br />Latitude: 34.089118<br />Longitude: -118.341948<br />Tags:
Fire Damage to Plating facility<br />Date Taken: 7/15/2014<br />Category: Stabilization Phase<br />Latitude: 34.089118<br />Longitude: -118.341948<br />Tags:
Material being collected from floor drain inside breezeway of plating facility.  Material will be pumped into large (4300 gal) baker tanks.<br />Date Taken: 7/15/2014<br />Category: Stabilization Phase<br />Latitude: 34.089118<br />Longitude: -118.341948<br />Tags:
Totes containing cyanide liquids that were pumped from vats inside plating facility.  There are 7 totes total.<br />Date Taken: 7/15/2014<br />Category: Stabilization Phase<br />Latitude: 34.089118<br />Longitude: -118.341948<br />Tags:
Stained concrete/sidewalk on west side of building (N. Sycamore Ave.)<br />Date Taken: 7/15/2014<br />Category: Stabilization Phase<br />Latitude: 34.089118<br />Longitude: -118.341948<br />Tags:
Clean up contractor removes soil from easment along easr side of building (Romaine)<br />Date Taken: 7/15/2014<br />Category: Stabilization Phase<br />Latitude: 34.089118<br />Longitude: -118.341948<br />Tags:
Roll-off bins filled with contaminated soil used to build berms to capture run-off.<br />Date Taken: 7/15/2014<br />Category: Stabilization Phase<br />Latitude: 34.089118<br />Longitude: -118.341948<br />Tags:
Area on east side of builing where material is leaking out of builing and on to street (Romaine)<br />Date Taken: 7/14/2014<br />Category: Stabilization Phase<br />Latitude: 34.089118<br />Longitude: -118.341948<br />Tags:
Fire damage to east side of building (Romaine).<br />Date Taken: 7/14/2014<br />Category: Stabilization Phase<br />Latitude: 34.089118<br />Longitude: -118.341948<br />Tags:
Fire damage to plating facility on east side of building (Romaine).<br />Date Taken: 7/14/2014<br />Category: Stabilization Phase<br />Latitude: 34.089118<br />Longitude: -118.341948<br />Tags:
Fire Damage to plating facility.  West sid eof building.<br />Date Taken: 7/14/2014<br />Category: Stabilization Phase<br />Latitude: 34.089118<br />Longitude: -118.341948<br />Tags:
Cracks in concrete will undoubtedly allow for chemicals to infiltrate subsurface.<br />Date Taken: 7/14/2014<br />Category: Stabilization Phase<br />Latitude: 34.089118<br />Longitude: -118.341948<br />Tags:
Anothr view of material leaking from building and draining to sidewalk on east side of building (Romaine)<br />Date Taken: 7/14/2014<br />Category: Stabilization Phase<br />Latitude: 34.089118<br />Longitude: -118.341948<br />Tags:
Side walk and gutter on east side of facility (Romaine).  Material is leaking from floor drain inside of buillding<br />Date Taken: 7/14/2014<br />Category: Stabilization Phase<br />Latitude: 34.089118<br />Longitude: -118.341948<br />Tags:
Side walk on North side of plating facility ( N. Sycamore Ave.).  Staining from chemicals is obvious.<br />Date Taken: 7/14/2014<br />Category: Stabilization Phase<br />Latitude: 34.089118<br />Longitude: -118.341948<br />Tags:
Contractor attempts to collect free standing liquid within the the facility untouched by fire.  This is northern entrance.  Staining of concrete is obvious.<br />Date Taken: 7/14/2014<br />Category: Stabilization Phase<br />Latitude: 34.089118<br />Longitude: -118.341948<br />Tags:
West Side of plating Facility following fire.<br />Date Taken: 7/14/2014<br />Category: Stabilization Phase<br />Latitude: 34.089118<br />Longitude: -118.341948<br />Tags: