U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Dixie Barrel & Drum

Images

All Images [40]
Categories
START & ERRS evaluating samples for disposal options.<br />Date Taken: 5/13/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
N.E. corner of the main building after Used Oil tank removed.<br />Date Taken: 7/16/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
NOAA Radar - Here it comes.....<br />Date Taken: <br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Waste solids & debris stored in roll-off.<br />Date Taken: 6/16/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Vat formerly used in acid treatment.<br />Date Taken: 6/15/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Crushed drums staged for disposal in roll-off<br />Date Taken: 7/1/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Oily waste pooling in excavation.<br />Date Taken: 9/24/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
ERRS cutting poly-drums in warehouse (top floor)<br />Date Taken: 4/13/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Former Operations Photo - Paint Coating at end of process<br />Date Taken: 9/9/1994<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
"Dixie House" Annex Storage on south side of property<br />Date Taken: 4/7/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Rear of "Dixie House" and drum storage<br />Date Taken: 4/7/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Saturated & Fresh Oil Pigs in place on rear loading dock<br />Date Taken: 4/7/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Waste Water Treatment [under shed rear of building]<br />Date Taken: 4/7/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Staging Empy Drum Inventory<br />Date Taken: 4/15/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Poly-drum cutting behind former annex storage.<br />Date Taken: 4/16/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
VIew of N.E. corner with Used Oil tank and booms in-place.<br />Date Taken: 5/12/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
TDEC photo of waste pouring from N.E. corner after heavy rain.<br />Date Taken: 5/4/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
ERRS & START teamed to collect and test drum samples.<br />Date Taken: 5/12/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Layout of the drum samples for waste group categorization.<br />Date Taken: 5/13/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
START breaking down the respective waste streams.<br />Date Taken: 5/13/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Conic tank formerly used for floculation for WWT system.<br />Date Taken: 5/17/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Corroded drum illustrating corrosive atmostphere in facility.<br />Date Taken: 6/16/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Former acid treatment vat.<br />Date Taken: 6/16/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Waste Paint staged for disposal.<br />Date Taken: 6/16/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Former waste water treatment tanks - Emptied<br />Date Taken: 6/15/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Sludge tanks in-series with Vac-Truck [Liquid Bulking]<br />Date Taken: 7/1/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Cleared warehouse (Top Floor)<br />Date Taken: 7/8/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Vac-Truck/Sludge Tank/ in-series to load liquid waste.<br />Date Taken: 6/23/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Afternoon thunderstorm<br />Date Taken: 6/18/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Panoramic of sludge box, vacuum truck & WWT bldg.<br />Date Taken: 6/8/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
After it's all cleaned - A mudslide !!!<br />Date Taken: 7/27/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Cutting holes in basement for below-slab sampling.<br />Date Taken: 6/20/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Disassembly of the former production line.<br />Date Taken: 7/14/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Mixing solids & adding concrete/lime to stabilize (pre-sampling)<br />Date Taken: 6/30/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Scrap metal in roll-off box.<br />Date Taken: 7/14/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Oily waste leaking from the NW corner of the building<br />Date Taken: 9/24/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Excavated contaminated soil & debris<br />Date Taken: 9/24/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Location of Removal Ops Phase III - N.E. corner of main bldg.<br />Date Taken: 9/24/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Examining the contaminated/clean layers by the loading dock<br />Date Taken: 9/24/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags:
Clean clay layer at 1 to 2 feet below surface.<br />Date Taken: 9/24/2004<br />Category: <br />Latitude: <br />Longitude: <br />Tags: