Northern site backfilled, graded, seeded and fully restored.
Public
6/20/2024
Eastern edge fully backfilled, graded and restored.
Public
6/15/2024
Backfilled, graded, seeded. Fully restored grid
Public
6/12/2024
The completed excavation of Grid D03.
Public
4/27/2024
View facing west of ERRS excavating grid C07.
Public
4/13/2024
View facing southwest of ERRS excavating grid E07 and E08.
Public
4/12/2024
View of ERRS excavating grid H09.
Public
4/11/2024
Wide view of grid C02 located on the northwest side of the property, submerged due to flooding conditions and close proximity to the Halfway Slough.
Public
4/11/2024
View of air monitoring equipment situated along the southwest perimeter of the impacted area.
Public
4/5/2024
Fragments of batteries were observed within the impacted grids.
Public
4/3/2024
View of ERRS clearing brush and trees from the impacted grids located on the north side of the property.
Public
4/3/2024
View of facility (right) and inundated rows 1,2, and 3 from atop the mulch pile located northwest of the Site. Facing East
Public
2/19/2020
Phase 3, AR001
Site facility. Mobile-style office building in the foreground and process building in the background. Photo facing west.
Public
11/6/2019
Wide-angle picture of facility from grid unit C03. Photo facing southeast.
Public
11/6/2019
FOSC measuring soil bore to divide into bags for homogenization. Photo facing west.
Public
9/11/2019
Soil bore sampling from grid unit J03. Picture facing north.
Public
9/11/2019