Lockformer

All POLREP's for this site Lockformer
Lisle, IL - EPA Region V
POLREP #4
Printer Friendly  |   PDF
 
On-Scene Coordinator - Steven Faryan 12/30/2002
- Removal Assessment Pollution Report (POLREP) #4
Pollution Report (POLREP) #4
Site Description
See Site Profile Page

Current Activities
U.S. EPA OSC Steve Faryan and Weston Solutions Inc. (WSI) START personal, Ben Maradkel continue conducting oversight, while PRP contractor installs soil vapor extraction (SVE) wells.

■ Installation of eleven soil vapor extraction (SVE) wells.

■ Reinforced haul road south of the Lockformer plant with more gravel to reduce tracking of mud on to the streets.

■ Transported and Disposed soil cuttings off-site.

■ Cut concrete inside the plant (west portion) to install SVE wells and electrodes.


Planned Removal Actions
■ PRP will remediate the surficial silty clay till and fill in Area 1 and 2 with Electrical Resistive Heating (ERH) technology.

■ PRP will remediate the mass waste sand and gravel in Area 1 and 2 with SVE technology.


Next Steps

■ Continue to install SVE wells.

■ Solve run-off problem in temporary parking lot (TBD e.g. catch basin)

■ Cut into concrete floor inside plant (former degreaser area).

■ Install equipment and process piping to the SVE wells.

■ Construct storage building.

■ Install electrodes and vapor wells for ERH.

■ Hookup vapor/air/water piping (ERH).

■ Review and Approve confirmation sampling plan.

■ Transport and Dispose soil cuttings and decontamination water off-site.