See polrep number 1.
September 1 through 5, 2004: ERRS Subcontracotr (1) ERRS Subcontractor conducted operations and maintenance activities. A total of 177 gallons of material recovered to date in the 1,000 gallon tank.
September 6 through 12, 2004: ERRS Subcontracotr (1) ERRS Subcontractor conducted operations and maintenance activities. A total of 179 gallons of material recovered to date in the 1,000 gallon tank.
September 13 through 19, 2004: ERRS Subcontracotr (1) ERRS Subcontractor conducted operations and maintenance activities. A total of 182 gallons of material recovered to date in the 1,000 gallon tank.
September 20 through 30, 2004: ERRS Subcontracotr (1) ERRS Subcontractor conducted operations and maintenance activities. A total of 185 gallons of material recovered to date in the 1,000 gallon tank.
-Continue to recover oil.
-Transportation and Disposal of recovered product as needed. - EPA and IDEQ to discuss next steps for upcoming year.
-IDEQ continued product and groundwater measurements of off site wells.
|