**** Sunday, February 27, 2005. (ERRS subcontractor DAL-1) No work.
**** Monday, February 28, 2005. (ERRS subcontractor DAL-1) DAL measured product levels inside of the 1,000 gallon storage tank, collected totalizer readings from the groundwater treatment system, and collected oil and groundwater depth readings in all on- and off-site wells. Amout of oil recovered since the groundwater pumps were installed - 340 gallons. Total oil recovered for the site is 540 gallons.
**** Tuesday, March 1, 2005. (ERRS subcontractor DAL-1) DAL measured product levels inside of the 1,000 gallon storage tank. Amout of oil recovered since the groundwater pumps were installed - 397 gallons. Total oil recovered for the site is 597 gallons.
**** Wednesday, March 2, 2005. (ERRS subcontractor DAL-1) DAL measured product levels inside of the 1,000 gallon storage tank, collected totalizer readings from the groundwater treatment system, and collected oil and groundwater depth readings in all on- and off-site wells. Amout of oil recovered since the groundwater pumps were installed - 455 gallons. Total oil recovered for the site is 655 gallons. Water samples were collected and submitted to a commercial laboratory to check water quality parameters of the groundwater treatment system's effluent.
**** Thursday, March 3, 2005 (ERRS subcontractor DAL-1) No work.
**** Friday, March 4, 2005. (ERRS subcontractor DAL-1) DAL measured product levels inside of the 1,000 gallon storage tank, collected totalizer readings from the groundwater treatment system, and collected oil and groundwater depth readings in all on- and off-site wells. Amout of oil recovered since the groundwater pumps were installed - 498 gallons. Total oil recovered for the site is 698 gallons. Note: System shut down due to low level alarm in the equilization tank. DAL adjusted the flowrate per discussion with START engineer. System back up and operational.
**** Saturday, March 5, 2005. (ERRS subcontractor DAL-1) DAL measured product levels inside of the 1,000 gallon storage tank, collected totalizer readings from the groundwater treatment system, and collected oil and groundwater depth readings in all on- and off-site wells. Amout of oil recovered since the groundwater pumps were installed - 571 gallons. Total oil recovered for the site is 771 gallons. DAL also cleaned the oil detection probes on the oil recovery pumps.
**** Sunday, March 6, 2005 (ERRS subcontractor DAL-1) DAL measured product levels inside of the 1,000 gallon storage tank, collected totalizer readings from the groundwater treatment system, and collected oil and groundwater depth readings in all on- and off-site wells. Amout of oil recovered since the groundwater pumps were installed - 686 gallons. Total oil recovered for the site is 886 gallons.
**** Monday, March 7, 2005 (ERRS subcontractor DAL-1) DAL measured product levels inside of the 1,000 gallon storage tank, collected totalizer readings from the groundwater treatment system, and collected oil and groundwater depth readings in all on- and off-site wells. Amout of oil recovered since the groundwater pumps were installed - 730 gallons. Total oil recovered for the site is 930 gallons.
**** Tuesday, March 8, 2005 (ERRS subcontractor DAL-1)DAL measured product levels inside of the 1,000 gallon storage tank, collected totalizer readings from the groundwater treatment system, and collected oil and groundwater depth readings in all on- and off-site wells. Amout of oil recovered since the groundwater pumps were installed - 760 gallons. Total oil recovered for the site is 960 gallons.
**** Wednesday, March 9, 2005 (ERRS subcontractor DAL-1)DAL measured product levels inside of the 1,000 gallon storage tank, collected totalizer readings from the groundwater treatment system, and collected oil and groundwater depth readings in all on- and off-site wells. Amout of oil recovered since the groundwater pumps were installed - 787 gallons. Total oil recovered for the site is 987 gallons. Water samples were collected and submitted to a commercial laboratory to check water quality parameters of the groundwater treatment system's effluent.
**** Thursday, March 10, 2005 (ERRS subcontractor DAL-1)DAL measured product levels inside of the 1,000 gallon storage tank, collected totalizer readings from the groundwater treatment system, and collected oil and groundwater depth readings in all on- and off-site wells. Amout of oil recovered since the groundwater pumps were installed - 802 gallons. Total oil recovered for the site is 1002 gallons. ERRS subcontractor Emerald Petroleum pumped approximately 792 gallons of gasoline/diesel and transported it off site for recycling (approximately 60 gallons remained inside the tank).
- Monitor effluent levels and change out Carbon Units as appropriate. - Pump out 1,000 gallon AST as needed. - Operate groundwater depression and oil recovery systems.
***** Install overhead powerline. ***** Transfer treatment system power connection from Texaco Sign to new overhead powerline. ***** Continue to collect water quality samples of the effluent. ***** Continue operation and maintenance plan for the product and groundwater systems. ***** Replace Carbon Units per water quality sample results.
EPA will operate these systems for another 6 months and then re-evaluate.
The power company was not able to install overhead powerline. EPA used the power from the Texaco sign as an interim measure until the line is run.
B&D Texaco reported that they did not receive insurance coverage through the Petroleum Storage Tank Fund and will be filing for bankrupcy.
|