Ashton Texaco Oil Release

All POLREP's for this site Ashton Texaco Oil Release
Ashton, ID - EPA Region X
POLREP #22 - Progress
Printer Friendly  |   PDF
 
On-Scene Coordinator - Michael Szerlog 3/10/2005
- Removal Action Pollution Report (POLREP) #22
Start Date: 2/14/2005
Pollution Report (POLREP) #22
Site Description
See polrep number 1.

Current Activities
**** Sunday, February 27, 2005. (ERRS subcontractor DAL-1)  No work.

**** Monday, February 28, 2005. (ERRS subcontractor DAL-1) DAL measured product levels inside of the 1,000 gallon storage tank, collected totalizer readings from the groundwater treatment system, and collected oil and groundwater depth readings in all on- and off-site wells.  Amout of oil recovered since the groundwater pumps were installed - 340 gallons.  Total oil recovered for the site is 540 gallons.

**** Tuesday, March 1, 2005. (ERRS subcontractor DAL-1)  DAL measured product levels inside of the 1,000 gallon storage tank.  Amout of oil recovered since the groundwater pumps were installed - 397 gallons.  Total oil recovered for the site is 597 gallons.

**** Wednesday, March 2, 2005. (ERRS subcontractor DAL-1)  DAL measured product levels inside of the 1,000 gallon storage tank, collected totalizer readings from the groundwater treatment system, and collected oil and groundwater depth readings in all on- and off-site wells.  Amout of oil recovered since the groundwater pumps were installed - 455 gallons.  Total oil recovered for the site is 655 gallons. Water samples were collected and submitted to a commercial laboratory to check water quality parameters of the groundwater treatment system's effluent.  

**** Thursday, March 3, 2005 (ERRS subcontractor DAL-1)  No work.

**** Friday, March 4, 2005. (ERRS subcontractor DAL-1)  DAL measured product levels inside of the 1,000 gallon storage tank, collected totalizer readings from the groundwater treatment system, and collected oil and groundwater depth readings in all on- and off-site wells.  Amout of oil recovered since the groundwater pumps were installed - 498 gallons.  Total oil recovered for the site is 698 gallons.  Note:  System shut down due to low level alarm in the equilization tank.  DAL adjusted the flowrate per discussion with START engineer.  System back up and operational.

**** Saturday, March 5, 2005. (ERRS subcontractor DAL-1) DAL measured product levels inside of the 1,000 gallon storage tank, collected totalizer readings from the groundwater treatment system, and collected oil and groundwater depth readings in all on- and off-site wells.  Amout of oil recovered since the groundwater pumps were installed - 571 gallons.  Total oil recovered for the site is 771 gallons.  DAL also cleaned the oil detection probes on the oil recovery pumps.

**** Sunday, March 6, 2005 (ERRS subcontractor DAL-1) DAL measured product levels inside of the 1,000 gallon storage tank, collected totalizer readings from the groundwater treatment system, and collected oil and groundwater depth readings in all on- and off-site wells.  Amout of oil recovered since the groundwater pumps were installed - 686 gallons.  Total oil recovered for the site is 886 gallons.

**** Monday, March 7, 2005  (ERRS subcontractor DAL-1) DAL measured product levels inside of the 1,000 gallon storage tank, collected totalizer readings from the groundwater treatment system, and collected oil and groundwater depth readings in all on- and off-site wells.  Amout of oil recovered since the groundwater pumps were installed - 730 gallons.  Total oil recovered for the site is 930 gallons.

**** Tuesday, March 8, 2005 (ERRS subcontractor DAL-1)DAL measured product levels inside of the 1,000 gallon storage tank, collected totalizer readings from the groundwater treatment system, and collected oil and groundwater depth readings in all on- and off-site wells.  Amout of oil recovered since the groundwater pumps were installed - 760 gallons.  Total oil recovered for the site is 960 gallons.

**** Wednesday, March 9, 2005 (ERRS subcontractor DAL-1)DAL measured product levels inside of the 1,000 gallon storage tank, collected totalizer readings from the groundwater treatment system, and collected oil and groundwater depth readings in all on- and off-site wells.  Amout of oil recovered since the groundwater pumps were installed - 787 gallons.  Total oil recovered for the site is 987 gallons.  Water samples were collected and submitted to a commercial laboratory to check water quality parameters of the groundwater treatment system's effluent.  

**** Thursday, March 10, 2005 (ERRS subcontractor DAL-1)DAL measured product levels inside of the 1,000 gallon storage tank, collected totalizer readings from the groundwater treatment system, and collected oil and groundwater depth readings in all on- and off-site wells.  Amout of oil recovered since the groundwater pumps were installed - 802 gallons.  Total oil recovered for the site is 1002 gallons.  ERRS subcontractor Emerald Petroleum pumped approximately 792 gallons of gasoline/diesel and transported it off site for recycling (approximately 60 gallons remained inside the tank).


Planned Removal Actions
- Monitor effluent levels and change out Carbon Units as appropriate.
- Pump out 1,000 gallon AST as needed.
- Operate groundwater depression and oil recovery systems.


Next Steps
***** Install overhead powerline.
***** Transfer treatment system power connection from Texaco Sign to new overhead powerline.  
***** Continue to collect water quality samples of the effluent.
***** Continue operation and maintenance plan for the product and groundwater systems.
***** Replace Carbon Units per water quality sample results.

EPA will operate these systems for another 6 months and then re-evaluate.


Key Issues
The power company was not able to install overhead powerline.  EPA used the power from the Texaco sign as an interim measure until the line is run.

B&D Texaco reported that they did not receive insurance coverage through the Petroleum Storage Tank Fund and will be filing for bankrupcy.


 
Disposition Of Wastes


Waste Stream Quantity Manifest # Disposal Facility
Gasoline/Diesel 792 gallons Bill of Lading Recycled by Emerald Petroleum in Salt Lake City, Utah