Friction Division Products

All POLREP's for this site Friction Division Products
Lawrence Township (Trenton), NJ - EPA Region II
POLREP #43 - Friction Oil Spill Removal
Printer Friendly  |   PDF
 
On-Scene Coordinator - Paul L. Kahn & Eric M. Daly 11/7/2007
Time-Critical - Removal Action Pollution Report (POLREP) #43
Start Date: 10/29/2007
Pollution Report (POLREP) #43
Site Description
This Site, a defunct automotive brake pad manufacturer, was brought to the attention of EPA by the NJDEP for a possible referral for a CERCLA removal action.  An inspection by EPA OSCs and a DEP responder on 12/23/05 revealed the following hazardous materials/wastes were abandoned at the site: tons of asbestos material, tons of elemental sulphur, 1,000+ drums of mostly unknown materials or materials that do not match the label description, hundreds of smaller containers, acids, flammable liquids, iron and aluminum powders, flammable solids, waste oil, solvents, and other contaminants or pollutants.  The Site is semi-controlled, with most doors being locked but numerous open windows or sections of sheet-metal walls missing. A maintenance man is on-site for a few hours Mon-Fri.  

During June, 2006, the OSC observed that employees of the RP, Friction Division Products, were entering the Site and loading contaminated drums and debris in a roll-off from Building #7. In the process of removing the contaminated debris they spilled powdered chemicals from broken bags on a pallet. EPA brought this to the attention of the property owners.  With EPA management authorization and the owner's permission EPA initiated security guard service as of June 15, 2006 to prevent access by the RP and other unauthorized persons.  Security guard service was discontinued on June 26, 2006, when the RP agreed to not enter the Site unless EPA was present.


Current Activities
On October 31, 2007, approximately 2,300 gallons of #2 oil was added to cut the #6 oil in order to pump out the tank.  Some piping needed to be removed in order to perform the sparging and the pumping operations.  

On November 01, 2007, the #6/#2 oil mixture was pumped from the tank.  There is still approximately one foot of #6 oil sludge in the tank which could not be removed by the sparging process.  Confined space entry is necessary to remove the remainder of the oil.  This work will be subcontracted and the 3 bid process has been initiated.

Oil Debris and PPE T&D is scheduled for November 07, 2007.  Subcontractors that are bidding on the tank entry clean out are scheduled for a site tour on November 07, 2007.  Site activity will cease until bid is awarded and next phase is scheduled.

Additional funds were requested and received from the OPA Fund.


Planned Removal Actions
Removal of the remaining #6 Oil Sludge from the 20,000 gallon tank.

Next Steps
Subcontractor Bid Award