See initial PolRep.
Continued the excavation of the contaminated areas.
Approximately 900 cubic yards of PCB-contaminated soils and 300 cubic yards on non-PCB-contaminated soils have been removed and stockpiled so far.
Continued the segragation of the drums and containers.
Approximately 140 drums have been removed to date.
Collected two soil samples from the stockpiles for disposal analysis.
Began setting up for transportation and disposal of the contaminated soils.
Continued the air sampling of both the perimeter and the work area.
• Remove and Sample Drums & Containers • Sample soil stockpiles & generate waste profiles • Perform Hazard Categorization • Overpack/Repack Drums & Containers • Excavate/Treat Impacted Soils, as necessary • Transport/Dispose Drums & Impacted Soils • Backfill & Grade Excavated Areas • Restore Site, as necessary
• Begin hauling excavated soils from site. • Continue excavation operations. •