See polrep number 1.
January 1 through 10, 2004: ERRS subcontractor (1) ERRS subcontractor conducted operations and maintenance activities, including cleaning the fuel extraction pumps. . A total of 104 gallons of material recovered in the 1,000 gallon tank. January 11 through 17, 2004: ERRS Subcontractor (1) ERRS Subcontractor conducted operations and maintenance activities, including cleaning the fuel extraction pumps. . A total of 107 gallons of material recovered in the 1,000 gallon tank.
January 18 through 24, 2004: ERRS Subcontractor (1) ERRS Subcontractor conducted operations and maintenance activities, including cleaning the fuel extraction pumps. A total of 113 gallons of material recovered in the 1,000 gallon tank.
January 25 through 31, 2004: ERRS Subcontracotr (1) ERRS Subcontractor conducted operations and maintenance activities, including cleaning the fuel extraction pumps. A total of 124 gallons of material recovered in the 1,000 gallon tank.
-Continue operation of the treatment system for another 6 month period and re-evaluate. This will complete a full year of product recovery over a full season of groundwater fluctuations.
-Transportation and Disposal of recovered product as needed. -EPA will re-evaluate the need to operate the system after 6-months.
IDEQ purchased treatment system and will provide collection services under an amended pollution removal funding authorization (PRFA).
|