See initial PolRep
Continued the air monitoring of both the perimeter and the work area.
Transported and disposed of approximately 425 tons of PCB-contaminated soils (approximately 2225 total tons).
Continued the excavation of areas of concern. Approximately 415 cubic yards of contaminated soils (2835 total cubic yards), 74 drums (392 total drums) and 13 paint cans (67 total paint cans) were excavated.
Collected samples of excavated soils and sent to an outside lab for analysis.
Remove and Sample Drums & Containers.
Sample soil stockpile & generate waste profiles.
Perform Hazard Categorization.
Excavate/Treat Impacted Soils, as necessary.
Transport/Dispose Drums & Impacted Soils.
Backfill & Grade Excavated Areas.
Restore Site, as necessary.
Transportation and disposal of treated soils.
Continue the excavation of contaminated soils and buried drums to four feet below surface.
Continue the air monitoring and sampling activities.
Continue the treatment of the mixed PCB waste.
Secure funding for the continuation and completion of the project.
|