California Gulch NPL (OU09-Lake Cnty Comm Health Prog)

All POLREP's for this site California Gulch NPL (OU09-Lake Cnty Comm Health Prog)
Leadville, CO - EPA Region VIII
POLREP #3 - Final POLREP
Printer Friendly  |   PDF
 
On-Scene Coordinator - Al Lange 9/6/2007
Non-Time-Critical - Removal Action Pollution Report (POLREP) #3
Start Date: 7/17/2006 Completion Date: 8/23/2007
Pollution Report (POLREP) #3
Site Description
At least 52 properties, located in the City of Leadville, Colorado, are addressed by this Removal.  The Properties have areas where the concentrations of lead in soil exceed the soil action levels of 3,500 parts per million (ppm).  

Nine of the Properties are within OU 9 of the California Gulch Superfund Site (Site) while one is at the Lake Fork Mobile Home Park.  The Leadville area, including portions of OU9, was the site of extensive mining, milling, and smelting operations that began about 1860.  Most mining operations ceased around 1900, although some facilities continued intermittent operations as late as the 1960s.  Most of the mines within the Site boundary are presently inactive and all of the mills and smelters have been demolished.  Site investigations showed the presence of heavy metals in soils and in waste piles in and around the current residential area of Leadville.  


Current Activities
Since the initial access agreements were obtained from the property owners by ASARCO’s contractor, EPA chose to have new accesses signed.   This was initiated on July 11, 2006, at a meeting with those owners on a list supplied by MFG, Co. (ASARCO’s contractor).  Plats constructed by ASARCO were reviewed with the owners on-site and most were modified prior to being signed by the property owner and the OSC. All the properties are being videoed prior to the removal and will be re-done after the restoration (after there is plant growth).  A final copy of the signed design plat with the lead concentrations at the base of the dig will be prepared and given to the owner along with a letter of certification of the removal completion and the make up of native grass or sod.  

The initial action was a meeting on July 11, 2006, by the OSC and other EPA representatives with the owners of the properties as listed by ASARCO’s contractor.  At the meeting, some of the property owners signed a newer access form drawn up by the EPA.  Some of the access agreements from 2006 were used in 2007, however, seven of the owners live away from Leadville and more time was required to get their signatures.   One out-of-town owner could not be contacted and therefore his property was not remediated.

The OSC visited the owners of the signed access forms and constructed design plats which detailed the removal process to be accomplished by ERRS.  START made digital videos prior to and after removals, and collected samples to determine the remaining Lead concentrations at the base of the excavations.  Based on the sampling completed by ASARCO’s contractor, six or twelve inches of contaminated soil were removed.  Replacement was a combination of clean fill and top soil.  The owners requested sod or a grass seed mixture that was developed from collecting area grasses.  The sod or  hydroseeded  grass was initially watered by ERRS for period of ten days.

During the removal, the contaminated material was placed in the Iron Hat Quarry. The clean fill material was removed from the Leadville Silver & Gold Borrow Pit and screened to a minus two inch size.  

The top soil came from an ASARCO pit located south of town and just southeast of the Leadville Rod and Gun Club. Samples of the top soil were sent to Colorado State University at Ft. Collins with the resulting analyses below:
        Sandy Loam    pH     5.9 Organic Matter 3.8 %     Zinc         29.7  ppm
Salts     0.3 mmhos/cm         Nitrate                  2  ppm             Iron            96.3  ppm                                                                                                          
         Lime    Low Phosphorus       4.9  ppm Manganese  125.7  ppm
           SAR       --- Potassium       158.0  ppm Copper        6.1  ppm

Initially, ten projects were designated as needing remediation.  One was added during the summer, making a current total of eleven projects.  There is a wide variability in the sizes of the projects from an oversized size lot (170 x 80’) to a hot spot of 6 x 33’.  Of the eleven:
Ten are completely done and sign off forms have been sent for signatures.
One owner was sent information but no response was forthcoming.

The approximate amounts of material removed and replaced is as follows:
Contaminated soil, grass, debris   =    2920 yd3
Backfill                                             =    1095   “
Top Soil =      900   “
Roadbase =      195    “
Sand, gravel, rocks =        85    “



Next Steps
At this time no future actions are planned for OU 9.