See POLREP #2 for site description.
The following activities were completed during the month of March: • The analytical results came back and indicated that the SulfiTech treatment was unsuccessful at reducing the TCLP samples to below 5 mg/L; • ERRS backfilled the excavation areas with fill; • START collected two five point composite samples from two 50ft by 50ft grids to confirm lead and PCBs concentrations are below the EPA’s cleanup levels; • START was on Site documenting Site activities.
A third shipment of SulfiTech is scheduled to be delivered on April 1, 2008
|