POLREP #6 - Cleanup Complete - Final POLREP
Printer Friendly  |   PDF
 
On-Scene Coordinator - Brian Kelly 10/26/2009
Time-Critical - Removal Action Pollution Report (POLREP) #6
Start Date: 12/23/2008 Completion Date: 10/26/2009
Pollution Report (POLREP) #6
Site Description
The Thorneapple Valley Site is located at 2900 Orleans Street in Detroit, Michigan. The facility is a former meatpacking plant adjacent to the Dequindre Cut, a former railroad line owned by Adrian and Blissfield Railroad (AB-RR). The facility is surrounded by active meatpacking plants, commercial facilities, and residential homes.  

A PCB spill from the Site had migrated a 1/4 mile from the Site along the Dequindre Cut through an area occupied by homeless people toward a rails-to-trails redevelopment. The Dequindre Cut leads to the Detroit River. MDEQ data showed that the PCB level in the soil was 6.9 ppm and 125 ppm at the source.  

An emergency response was initiated after a joint MDEQ-EPA site visit observed oil flowing down the Dequindre Cut, rail workers driving through the area, and a homeless man living 10 feet from the spill. U.S. EPA requested assistance from City of Detroit Fire and Environmental Affairs in responding.


Current Activities
Between January 23 and September 1, 2009, the PRP, Fodale LLC, excavated 5,000 cubic yards of PCB contaminated soil. Confirmation sample results showed PCB levels in the soil to be below 1 ppm, which was the cleanup requirement. The PRP also removed 500 gallons of PCB oil from the tank inside the building and backfilled the contaminated area.

While having completed the field work, Fodale LLC initially failed to remove a frac tank of PCB oil.  U.S. EPA had started to complete the frac tank disposal when Fodale completed the disposal.  On October 26, 2009, U.S. EPA verified the removal of all wastes.


Planned Removal Actions
None

Next Steps
Review final report to be submitted by Fodale LLC.

Key Issues
None