U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Ecusta Mill

All POLREP's for this site Ecusta Mill
Pisgah Forest, NC - EPA Region IV
POLREP #25 - On Going Removal Activities from 05/26/2009 to 05/29/2009
Printer Friendly  |   PDF
 
On-Scene Coordinator - Jennifer Wendel 6/4/2009
Time-Critical - Removal Action Pollution Report (POLREP) #25
Start Date: 9/22/2008
Pollution Report (POLREP) #25
Site Description
The Ecusta Mill is a former flax pulping and paper manufacturing facility that was built in 1939 and was operational until 2002.  Cellophane production also occurred at the facility for approximately 30 years.  In addition, the following activities have occurred at the Site:  chlorine production operations using Sorenson mercury cells (electro-chemical building); caustic storage; water and wastewater treatment; and printing.  EPA's Removal Program and the North Carolina Department of Environment and Natural Resources (NC DENR) first responded when the plant was closed down in 2002.  Of primary concern were potential releases from an interruption of power to the basement sumps under the production buildings.  The EPA Environmental Response Team conducted sampling of the concrete floor, the sub-floor, and soils under the electro-chemical building and sediments in on-site ditches.  This sampling confirmed the presence of mercury in the sub-floor structures to 16 feet below ground surface (580 mg/kg) and the floor drains (260 mg/kg) of the electro-chemical building, in the indoor air and in the overland drainage ditches which had received historic discharge from the building.

An Expanded Site Inspection (ESI) was conducted by EPA Region 4, Science and Ecosystem Support Division and the State in March, 2004.  The ESI focused on two main areas of concern, the electro-chemical building and the Aeration and Sedimentation Basin (ASB) area.  Mercury was detected in soils adjacent to the electro-chemical building, in sediments in the on-site drainage ditches and in sediments of the Davison River immediately adjacent to the manufacturing area. The ESI also confirmed soils and sediments in other areas of the site are contaminated with mercury and dioxin.   Groundwater sampling has confirmed low-levels of mercury in groundwater near the electro-chemical building, low levels of carbon disulfide and 1,1-Dichloroethane near the cellophane plant, and a high pH reading (pH 12.17) in the area of a previous caustic spill.

The total Site is approximately 527 acres in a mixed-use residential/industrial area.  The manufacturing facility is approximately 213 acres. The ASB has a surface area of approximately 75 acres and was used for wastewater treatment.  The ASB also receives storm water from approximately one-third of the site, including those areas historically most actively involved in paper production.  The following industrial solid waste landfills are located at the Site:  the Island landfill, the new ash landfill; the old ash and sludge landfills which are unlined industrial landfills which do not have permit numbers issued.  The previous site owner is in the process of closing all landfills in compliance with State permit requirements.

A small arms firing range has been historically operated on the Site south of the main manufacturing operations on a largely undeveloped parcel of land near the confluence of the Davidson and French Broad Rivers.  Lead impacted soil has been document from the historic firing range.

Renova Partners, a Brownfields redevelopment company purchased the property in January 2008.  Renova formed a subsidiary company Davidson River Village, LLC (DRV) who is conducting complete demolition of all on-site structures prior to site redevelopment.  D.H. Griffin was retained by DRV to conduct the demolition.  

DRV is conducting the Removal Activities at the site under an AOC with EPA.  They have hired Shaw Environmental as the lead environmental contractor. Removal Activities include a Time Critical Removal Action and 2 Non-Time Critical Removal Actions.  



Current Activities
DEMOLITION & SUPPORT
•  Shaw and DH Griffin performed building clearances for buildings 44 and 52.

•  DH Griffin continued removing utilities to down to 4 feet below ground surface.  Shaw provided QC oversight.

•  DH Griffin continued crushing operations in the north and south ends of the site.

•  DH Griffin began demolition of buildings 44 and 52.  

•  DH Griffin continued demolition of building slabs 43,46,48,50,57.

•  DH Griffin continued perimeter dust monitoring. No dust issues or exceedences were noted.

•  DH Griffin continued grading operations in the northeast corner of the site and the filter plant area.

•  DRV continued discharging from the north clarifier into the ASB.

ENVIRONMENTAL
•  Shaw collected samples from crush material for lead analysis.  Analytical results are all below regulatory guidelines.

•  Shaw performed daily volatiles monitoring of soil stockpiles in building 89.

•  Shaw collected a leachate sample from brown # for RCRA TCLP and total metals analysis.


Planned Removal Actions
DEMOLITION & SUPPPORT
•  DH Griffin will take down the black liquor tank 61.

•  Shaw and DH Griffin will continue the building clearance process.

•  DH Griffin demolition activities will continue for cleared buildings.

•  DH Griffin will continue loading out scrap, C&D debris and non-hazardous materials.

•  DH Griffin will continue removing utilities down to 4 ft below ground level.  Shaw will continue QC oversight.  

•  DH Griffin/Shaw will continue slab removal and investigation process.

•  DH Griffin will continue grading operations starting from the northeast end of the site moving south. Grading operations will include arsenic soil from the cellophane area.

ENVIRONMENTAL
•  Shaw will continue collecting samples for crushed debris.
  
•  Shaw will continue site wide sub-slab analysis and utility investigation.

•  State/federal regulators will continue to investigate arsenic soil background levels.

•  Shaw will continue to monitor staged soil in building 89 for volatiles.

•  Shaw will excavate arsenic impacted soil at building 63, stage the material in 89, and collect XRF confirmation samples.

•  Shaw will excavate arsenic impacted soil at the cellophane area and transfer to the coal yard.  Confirmation samples will be collected and analyzed on site with an XRF and a percentage to an off-site lab.


 
Disposition Of Wastes
•  DH Griffin shipped 62 loads of scrap metal weighing 960 tons to the DH Griffins Greensboro office for recycling.