U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Perryville PCB Site

All POLREP's for this site Perryville PCB Site
Perryville, MD - EPA Region III
POLREP #5 - Final Polrep - Voluntary Cleanup Completed
Printer Friendly  |   PDF
 
On-Scene Coordinator - Gregory Ham, On Scene Coordinator 8/2/2010
Time-Critical - Removal Action Pollution Report (POLREP) #5
Completion Date: 7/2/2010
Pollution Report (POLREP) #5
Site Description
This site is at the Perryville, Maryland water filtration plant.  A contractor working onsite on March 5, 2009, removed a transformer containing PCB oils.  The level of PCB in the oil was greater than 20%. The oil from the transformer was spread over a portion of the site.  The MDE arrived onsite Saturday evening, March 7, 2009, and sampled the oil.  Lab results received Monday morning indicated the presence of PCBs at high levels in the oil.  MDE requested EPA assistance with the site.


Current Activities
The second cleanup contractor completed the excavation and offsite disposal of contaminated soils on or about October 30, 2009.  They shipped approximately 780 tons of PCB contaminated soils from the site.  Post excavation sampling indicated that all of the sampling locations except for 4 were below the cleanup level of 25 ppm.  Of these four, two were at 30 pppm, two were higher.  The OSC determined that these results were acceptable and that the excavation area could be backfilled.  The two higher samples were located in bedrock  at approximately 5 to 8 feet below ground surface where it was not practicable to excavate further.  These areas were backfilled with a layer of bentonite clay to minimize contaminant migration.  The entire excavation area was then backfilled with clean fill and seeded.  

On June 30, 2010 and July 2, 2010, the remaining wastes from the initial cleanup contractor were shipped offsite for disposal.  On July 16, 2010, the OSC went to the site and observed that the wastes had been removed and obtained copies of the manifests for the wastes. Therefore, all wastes, (including the transformer carscass) have been removed from the site.



Next Steps
No further EPA actions are planned at this site.  The site is considered closed.