2.1.1 Narrative
On April 8, 2010, Sam Poppell (RERT Commander), Eric Daly (OSC), Geoff Garrison (OSC), Eira Medina (EQB), and PR Departamento De Corrección Personnel met at the Guaynabo Facility. The 37 IonScan 400 Units were separated from the non-radiological pump units, information transcribed from each unit (radiological source number, model number, serial number, and Departamento De Corrección number if available), and the leak test performed as per instructions by Smiths Detection.
On April 9, 2010, the leak test kits were shipped from Guaynabo, PR to Warren, NJ via Fed Ex.
On April 12, 2010, 37 leak test kits were received by Smiths Detection in NJ. The kits were shipped to Toronto Canada. Once the leak tests are received by the laboratory in Toronto, the results should be available within two weeks.
Due to relocation of Smiths Detection Facilities, shipment of the units cannot be shipped until June 1, 2010. Departamento De Corrección and Smiths Detection will work out financial details prior to the June 1st shipment, 10 units at a time.
No EPA Contractor Resources are planned on being utilized during this removal (Emergency PRP Removal without an Enforcement Instrument).
2.1.2 Response Actions to Date
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
2.1.4 Progress Metrics