U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
ESI-PRP Removal - Removal Polrep

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V
|
|
Subject:
|
POLREP #16
Progress
ESI-PRP Removal
B5YS
Indianapolis, IN
Latitude: 39.9128600 Longitude: -86.2423680
|
|
To:
|
Sue Michael, City of Indianapolis
Tom White, Citizens Energy Group
Harry Atkinson, IDEM
Ryan Groves, IDEM
Megan Nagle, IDEM
George Ritchotte, IDEM
Jason Doerflein, Marion County Health Department
Sam Bruner, Pike Fire Department
John Maritote, U.S. EPA Region V
Janet Pope, U.S. EPA Region V
Kim Cussen, United Water
Stan Rigney, IDEM
Randy Braun, IDEM
Maupin Natalie, IDEM
Eric Kaufman, Marion County Health Department
Jason Ravenscroft, Marion County Health Department
Dan Sparks, USFWS
Ed Karecki, USFWS
Bob Masbaum, Citizens Energy Group
Kristen Heitman, Providence Wildlife
Michael Massonne, City of Indianapolis
Cheryl Carlson, Citizens Energy Group
Emily Mack, City of Indianapolis
Thomas Marks, U.S. EPA
Rex Osborn, IDEM
Gabriele Hauer, IDEM
Max Michael, IDEM
Deirdre Wyatt, IDEM
Jennifer Schick, City of Indianapolis
|
|
From:
|
Verneta Simon & Anita L. Boseman, On-Scene Coordinators
|
|
Date:
|
8/15/2011
|
|
Reporting Period:
|
8/6/2011 - 8/12/2011
|
|
1. Introduction
|
|
|
1.1 Background
|
|
|
|
|
Site Number: |
B5YS |
|
Contract Number: |
|
|
D.O. Number: |
|
|
Action Memo Date: |
9/30/2010 |
|
Response Authority: |
CERCLA |
|
Response Type: |
PRP Oversight |
|
Response Lead: |
PRP |
|
Incident Category: |
Removal Action |
|
NPL Status: |
Non NPL |
|
Operable Unit: |
|
|
Mobilization Date: |
4/6/2011 |
|
Start Date: |
4/6/2011 |
|
Demob Date: |
|
|
Completion Date: |
|
|
CERCLIS ID: |
INN0051050501 |
|
RCRIS ID: |
|
|
ERNS No.: |
|
|
State Notification: |
|
|
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
Bankrupt Commercial Used Oils Facility
1.1.2 Site Description
See POLREP 1
1.1.2.1 Location
4910 West 86th Street, Indianapolis, Indiana 46268
|
|
2. Current Activities
|
|
|
2.1 Operations Section
|
|
|
|
2.1.1 Narrative
See POLREP 1
2.1.2 Response Actions to Date
On August 8, 2011, Midwest
hauled off 5 loads (28,000 gal) of oily water from the access
pit/control structure to United Waste Water Inc.'s facility in
Cincinnati, OH.
- Midwest cleaned sludge out of the DAF Tanks. The sludge was moved to vac boxes.
- Midwest removed portions of the Tank 51 outer skin in preparation for sludge sampling.
- TriHydro conducted air monitoring around the perimeter of the Site. All results were background/non-detect.
On August 9, 2011, Midwest
hauled off 8 loads (48,000 gal) of oily water from the access
pit/control structure and west million gallon bunker tank to United
Waste Water Inc.s facility in Cincinnati, OH and 2 loads (10,400 gal) of
oily water from the northeast area storm sewer (SS23) to Clean Water
Limited's Cherokee Drive Facility in Dayton, OH.
- Thunderstorms dropped 0.55" of rain
on the Site during the overnight hours. Some water was pooled in the
northeast area stormsewers and the formerly dry East Containment.
- Midwest continued cleaning sludge out of the DAF tanks. The sludge was moved to vac boxes.
- Midwest pumped liquid from the east million gallon bunker tank to the west million gallon bunker tank. When liquid is removed from the access pit/control structure, the liquid level in the west million gallon bunker tank drops.
- Midwest opened sampling ports on the north and west sides of Tank 51.
- A
water tanker broke a hydraulic line and spilled some hydraulic oil.
The spill was contained with booms, and the area was powerwashed.
On August 10, 2011, Midwest
hauled off 7 loads (40,500 gal) of oily water from the access
pit/control structure, northeast area stormsewer, and west million gallon bunker tank to United
Waste Water Inc.s facility in Cincinnati, OH and 2 loads (11,650 gal) of
oily water from the west million gallon bunker tank to Clean Water
Limited's Cherokee Drive Facility in Dayton, OH.
- Less than 0.10" of rain fell at the Site during the overnight hours. The rain did not impact the stormsewers.
- Midwest continued cleaning sludge out of the DAF tanks and oil unloading pit/frybasket. The sludge was moved to vac boxes.
- Midwest pumped liquid from the east million gallon bunker tank to the west million gallon bunker tank. When liquid is removed from the access pit/control structure, the liquid level in the west million gallon bunker tank drops.
- Wind
and rain spread fiberglass insulation and other debris from the Tank 51
outer skin into the Tank 51 containment. Midwest used a bobcat and
rakes to collect the debris.
- TriHydro collected two composite (0-12') sludge samples from Tank 51.
- Tank51ASL20110810 from the north sampling port.
- Tank51BSL20110810 from the west sampling port.
- Both samples analyzed for Total VOCs, Total SVOCs, RCRA metals, flashpoint, pH, and PCBs.
On August 11, 2011, Midwest
hauled off 6 loads (35,522 gal) of oily water from the access
pit/control structure to United
Waste Water Inc.s facility in Cincinnati, OH and 2 loads (10,500 gal) of
oily water from the access
pit/control structure to Clean Water
Limited's Cherokee Drive Facility in Dayton, OH.
- Midwest completed final cleaning of the Oil Unloading Pit (frybasket), South DAF, South API, Frac Tank 3 (10), Frac Tank 2 (9), Frac Tank 1 (8), and Frac Tank 4 (7).
- Midwest continued cleaning sludge out of the north DAF. The sludge was moved into vac boxes.
- Midwest mobilized two additional 3,500 gallon vac boxes.
- Midwest pumped liquid from the east million gallon bunker tank to the west million gallon bunker tank. When liquid is removed from the access pit/control structure, the liquid level in the west million gallon bunker tank drops.
- TriHydro requested visual inspection of the following vessels: Oil Unloading Pit (frybasket), South DAF, South API, Frac Tank 3 (10), Frac Tank 2 (9), Frac Tank 1 (8), and Frac Tank 4 (7). There was no visible gross contamination on the walls or floors of any of the vessels. The condition was documented with two photos for each vessel, and they can be seen in the images section of this website.
- TriHydro moved approximately 10,000 gallons of treated water into Tank 6. TriHydro then treated additional water and placed it in frac tanks. This was done to add stormwater storage capacity in the event of rain over the weekend.
- U.S. EPA issued a Work Plan Approval Letter.
On August 12, 2011, Midwest
hauled off 3 loads (17,070 gal) of oily water from the access
pit/control structure to United
Waste Water Inc.s facility in Cincinnati, OH and 2 loads (10,500 gal) of
oily water from the access
pit/control structure to Clean Water
Limited's Cherokee Drive Facility in Dayton, OH.
- Midwest hauled off (3) Subtitle D 20yd3 roll off boxes to the Southside Landfill in Indianapolis, IN. Three empty 20yd3 roll off boxes were left by the drivers.
- Midwest finished final cleaning of the north DAF tank.
- Midwest pumped liquid from the east million gallon bunker tank to the west million gallon bunker tank. When liquid is removed from the access pit/control structure, the liquid level in the west million gallon bunker tank drops.
- Midwest placed new sandbags on the curbing of the southeast side of the northeast area to prevent any stormwater from escaping the Site if there are rains over the weekend.
- TriHydro requested visual inspection of the north DAF tank. There was no visible gross contamination on the interior walls and floors of the north DAF tank. The condition was documented with two photos, and they can been seen in the images section of this website.
- TriHydro moved approximately 30,000 gallons of treated water from frac tanks into Tank 6. TriHydro then treated additional water and placed it in frac tanks. This was done to clear more capacity for stormwater storage in anticipation of rain this weekend
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
N/A
2.1.4 Progress Metrics
| Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
| Oily Water |
Liquid |
2,734,135 gallons |
|
X |
|
| Stormwater |
Liquid |
424,956 gallons |
|
X |
|
| Tank 51 Containment |
Liquid |
335,120 gallons |
|
X |
|
| Totes and Drums |
Liquid |
3,885 gallons |
|
X |
|
|
|
|
2.2 Planning Section
|
|
|
|
2.2.1 Anticipated Activities
- Pilot test for bunker tank removal activities to take place during the week of August 22, 2011.
2.2.1.1 Planned Response Activities
None
2.2.1.2 Next Steps
US EPA will provide oversight of PRP Group removal activities.
Use decontaminated Tank 6 for storm water storage.
2.2.2 Issues
Starting in Mid-July, the weather became very hot and humid, and special care was taken to make sure that people working outside are well hydrated and taking adequate breaks.
Groundwater infiltration is suspected in the sanitary sewer system on Site. Trihydro is investigating potential options for mitigating infiltration.
Standing water has been observed in several locations around the site. Warmer weather can lead to mosquito breeding in standing water. EPA has requested that Trihydro address all standing water on site as soon as possible.
Ongoing management of wildlife at the site due to nearby ecosystems.
In previous POLREPs an incorrect name was used when referring to the oily water disposal facility. The correct name should be United Waste Water, Inc. not United Water.
|
|
|
2.3 Logistics Section
|
|
|
|
Not applicable.
|
|
|
2.4 Finance Section
|
|
|
|
No information available at this time.
|
|
|
2.5 Other Command Staff
|
|
|
|
2.5.1 Safety Officer Not applicable.
2.6 Liaison Officer Not applicable.
2.7 Information Officer 2.7.1 Public Information Officer
2.7.2 Community Involvement Coordinator
A date has not been selected for the next community meeting.
|
|
3. Participating Entities
|
|
|
3.1 Unified Command Indiana Department of Environmental Management
Indianapolis Department of Public Works
Pike Township Fire Department
City of Indianapolis
3.2 Cooperating Agencies Marion County Health Department
|
|
4. Personnel On Site
|
|
|
U.S. EPA
START Contractor
|
|
5. Definition of Terms
|
|
|
ASAOC – Administrative Settlement Agreement on Consent
ERRS – Emergency and Rapid Response Services
IDEM – Indiana Department of Environmental Management
OSC – On-Scene Coordinator
POLREP – Pollution Report
PRP - Potentially Responsible Party
RCRA – Resource Conservation and Recovery Act
START – Superfund Technical Assessment and Response Team
U.S. EPA – United States Environmental Protection Agency
|
|
6. Additional sources of information
|
|
|
6.1 Internet location of additional information/report For additional information, please refer to the US EPA lead removal action website at www.epaosc.org/esi
6.2 Reporting Schedule The next POLREP will be submitted at a date to be determined.
|
|
7. Situational Reference Materials
|
|
|
For additional information, please refer to the documents section at www.epaosc.org/esi
|
|
|