U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Dickinson Site - Removal Polrep
Initial Removal Polrep

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region IV
|
|
Subject:
|
POLREP #1
Initial POLREP
Dickinson Site
B47S
Melbourne, FL
Latitude: 28.0915850 Longitude: -80.7021320
|
|
To:
|
Jim Webster, PhD., USEPA R4 ERRB
Matt Taylor, USEPA R4 ERRB
Gwen Keenan, FLDEP
|
|
From:
|
Chris Russell, OSC
|
|
Date:
|
7/11/2012
|
|
Reporting Period:
|
7/13/2012
|
|
1. Introduction
|
|
|
1.1 Background
|
|
|
|
|
Site Number: |
B47S |
|
Contract Number: |
|
|
D.O. Number: |
|
|
Action Memo Date: |
|
|
Response Authority: |
CERCLA |
|
Response Type: |
Emergency |
|
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
|
NPL Status: |
Non NPL |
|
Operable Unit: |
|
|
Mobilization Date: |
7/11/2012 |
|
Start Date: |
7/11/2012 |
|
Demob Date: |
|
|
Completion Date: |
|
|
CERCLIS ID: |
|
|
RCRIS ID: |
|
|
ERNS No.: |
NRC 1017421 |
|
State Notification: |
YES |
|
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
CERCLA Emergency Response
1.1.2 Site Description and Threat
On Wednesday, July 11, 2012, EPA received a request for assistance from FDEP for a site involving improperly stored, and leaking containers of hazardous substances. OSC Russell responded to the site on July 11 and met with FDEP representatives, the site property owner, and the PRP. The initial inspection revealed 7 covered trailers and 2 box trucks containing hazardous substances. The initial inspection revealed leaking containers of flammables, acids, and bases. Furthermore, evidence of continual trespassing by youths was observed and the PRP advised that trespassing on site is a constant issue (two residential areas are in close proximity). The PRP stated he would contract with a cleanup contractor, and scheduled a meeting for the morning of July 12.
On July 12, the PRP received a quote from SWS to complete removal activities at the site, and stated he was unable to pay for the removal activities and advised EPA that he could not perform the actions necessary. EPA issued a Notice of Federal Assumption to both the PRP and the property owner.
1.1.2.1 Location
1080 S. John Rodes Blvd
Melbourne, FL 32904
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
Approximately 3500 containers are located at the site, stored inside 7 trailers and 2 box trucks. Some of the containers are leaking and/or stored with incompatible substances. Flammables, acids, and bases are stored in the trailers and some of the containers are leaking.
|
|
2. Current Activities
|
|
|
2.1 Operations Section
|
|
|
|
2.1.1 Narrative
On July 12, the PRP received a quote from SWS, an environmental cleanup contractor, for removal activities at the site. After receiving the quote, the PRP advised the EPA that he was unable to conduct the necessary removal actions. EPA issued a Notice of Federal Assumption and both the PRP and property owner signed the notices, as well as new Access Agreements that included removal operations.
2.1.2 Response Actions to Date
START conducted a rough container inventory at the site without disturbing the storage of the containers, and collected photographic documentation of storage conditions.
ERRS has been mobilized to the site to provide site security which will include both a physical presence on site 24 hours a day as well as the installation of a perimeter fence to prevent further trespassing.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
PRPs have been identified and contacted.
2.1.4 Progress Metrics
| Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
| |
|
|
|
|
|
| |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
2.2 Planning Section
|
|
|
|
2.2.1 Anticipated Activities
EPA will secure the site with permanent fencing to allow more time to contact PRPs and complete assessment of PRP-led cleanup options.
2.2.1.1 Planned Response Activities
Fencing will be installed as soon as possible with a commencement date of July 13, 2012.
2.2.1.2 Next Steps
2.2.2 Issues
|
|
|
2.3 Logistics Section
|
|
|
|
No information available at this time.
|
|
|
2.4 Finance Section
|
|
|
|
|
|
|
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
| ERRS - Cleanup Contractor |
$75,000.00 |
$1,000.00 |
$74,000.00 |
98.67% |
| TAT/START |
$15,000.00 |
$3,000.00 |
$12,000.00 |
80.00% |
|
Intramural Costs
|
| |
| Total Site Costs |
$90,000.00 |
$4,000.00 |
$86,000.00 |
95.56% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
|
|
|
2.5 Other Command Staff
|
|
|
|
No information available at this time.
|
|
3. Participating Entities
|
|
|
3.1 Unified Command
3.2 Cooperating Agencies
FDEP, FWCC
|
|
4. Personnel On Site
|
|
|
July 11
1 EPA
2 FDEP
1 START
July 12
1 EPA
2 FDEP
2 START
3 ERRS
Julyl 12
1 EPA
3 ERRS
1 START
|
|
5. Definition of Terms
|
|
|
FDEP - Florida Department of Environmental Protection
PRP - Potentially Responsible Party
|
|
6. Additional sources of information
|
|
|
No information available at this time.
|
|
7. Situational Reference Materials
|
|
|
No information available at this time.
|
|
POLREP #1 Last Updated 7/13/2012
|
|
|