1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
B4W5 |
|
Contract Number: |
|
D.O. Number: |
|
|
Action Memo Date: |
10/16/2012 |
Response Authority: |
CERCLA |
|
Response Type: |
Emergency |
Response Lead: |
EPA |
|
Incident Category: |
Removal Assessment |
NPL Status: |
Non NPL |
|
Operable Unit: |
|
Mobilization Date: |
10/15/2012 |
|
Start Date: |
10/16/2012 |
Demob Date: |
|
|
Completion Date: |
|
CERCLIS ID: |
MSN000410900 |
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
10/14/2012 |
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
Emergency Response
1.1.2 Site Description
Bankrupt and abandoned bio-diesel facility. Site currently supports an office building and production building. There are two 10,000 gallons above ground storage tanks one of which contains flammable liquids and is leaking onto the ground. Scattered along the property there are approximately 50 plastic totes and containers ranging in size from drums to small lab size bottles.
1.1.2.1 Location
Located at the end of Ben Coggins Avenue off Will Robbins Highway, within the City of Limits of the City of Nettleton, MS.
1.1.2.2 Description of Threat
Leaking storage tanks and plastic totes are present at the site. An open pit containng a yet undetermined amount of liquids and sludges covered by a hardened crust of unknown composition is also present. The pit is almost to capacity and could overflow with any significant rain event.
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
Leaking storage tanks and plastic totes are present at the site. An open pit containng a yet undetermined amount of liquids and sludges covered by a hardened crust of unknown composition is also present. The pit is almost to capacity and could overflow with any significant rain event.
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
2.1.1 Narrative
2.1.2 Response Actions to Date
OSC has mobilized START and ERRS resources to the Site. START collected a sample from the leaking stoirage tank and conducted hazard categorization. It was determined that the liquid is a flamable. START has also initiated preparations to conduct additional sampling durng the next operational period.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
Pending
2.1.4 Progress Metrics
Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.2 Planning Section
|
|
|
2.2.1 Anticipated Activities
START contractors to initiate the sampling of the multiple containers and subsequently hazardous categorization of all materials.
2.2.1.1 Planned Response Activities
Conduct full assesement. Sample and haz categorize chemicals present. Bulk waste streams and arrange for disposal.
2.2.1.2 Next Steps
2.2.2 Issues
|
|
2.3 Logistics Section
|
|
|
No information available at this time.
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
No information available at this time.
|
3. Participating Entities
|
|
3.1 Unified Command
3.2 Cooperating Agencies
City of Nettleton
Nettlenton Police
|
4. Personnel On Site
|
|
EPA 1
START 1
ERRS 1
|
5. Definition of Terms
|
|
No information available at this time.
|
6. Additional sources of information
|
|
No information available at this time.
|
7. Situational Reference Materials
|
|