U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Pilsen Soil OU1 Railroad Spur and Alley Site - Removal Polrep
Initial Removal Polrep

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V
|
|
Subject:
|
POLREP #1
Initial
Pilsen Soil OU1 Railroad Spur and Alley Site
C5N8 OU1
Chicago, IL
Latitude: 41.8535941 Longitude: -87.6610085
|
|
To:
|
Doug Ballotti, U.S. EPA
Lindy Nelson, DOI
Blaine Kinsley, IL. EPA
Bruce Everetts, IL. EPA
Dave Graham, Chicago Dept. of Health
Terry Sheahan, Chicago Dept. of Health
Vicente Sanchez, Alderman Solis (Chief of Staff)
Mark Johnson, ATSDR
Samuel Borries, U.S. EPA
Jason El-zein, U.S. EPA
Peachey Robert, ORC U.S. EPA
Anne Rowan, U.S. EPA
Brian Schlieger, U.S. EPA HQ
Kimberly Worthington, Chicago Dept. of Health
Ken Page, IL. EPA
|
|
From:
|
Ramon Mendoza, On-Scene Coordinator
|
|
Date:
|
11/20/2015
|
|
Reporting Period:
|
11/16 to 11/19/2015
|
|
1. Introduction
|
|
|
1.1 Background
|
|
|
|
|
Site Number: |
C5N8 OU1 |
|
Contract Number: |
|
|
D.O. Number: |
|
|
Action Memo Date: |
6/22/2015 |
|
Response Authority: |
CERCLA |
|
Response Type: |
Time-Critical |
|
Response Lead: |
PRP |
|
Incident Category: |
Removal Action |
|
NPL Status: |
Non NPL |
|
Operable Unit: |
1 |
|
Mobilization Date: |
11/16/2015 |
|
Start Date: |
11/16/2015 |
|
Demob Date: |
|
|
Completion Date: |
|
|
CERCLIS ID: |
|
|
RCRIS ID: |
|
|
ERNS No.: |
|
|
State Notification: |
|
|
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
Time Critical Removal Action
1.1.2 Site Description
The
Site consists of an alley (owned by the City of Chicago) and a railroad spur
(historically operated by Burlington Northern Santa Fe Railway [BNSF]) located
in the Lower West Side (Pilsen) area of Chicago, Cook County. The Site is in the City’s
25th Ward. The east to west portion of the
alley is approximately 460 feet (ft) long and 18 ft wide (approximately 8,280
square feet [ft2] in area) and is roughly paved with asphalt over
25% of its length from the east side. The north to south portion of the alley is
about 110 feet long. The remaining 75%
of the alley is soil. The alley connects South Loomis Street and South Throop Street and is south of West 21st
Street and north of West Cermak Road. The
alley is bordered to the north by H. Kramer and Company (H. Kramer) and Co., the east
by South Throop Street, to the south by commercial and industrial businesses,
and to the west by the railroad spur and then South Loomis Street.
The railroad spur is approximately 1,120 ft
long and 28,215 ft2 in total area. The railroad spur consists of an unused rail
track and soil
and asphalt where it is bisected by South Loomis Street. The
western portion of the railroad spur is located in the north region of a
property occupied by the Benito Juarez Community Academy (Juarez), located at
1450-1510 West Cermak Road. The railroad spur curves to the
south, crosses South Loomis Street, and extends along the west boundary of H.
Kramer, located at 1345 West 21st Street. The eastern portion of the
railroad spur is bordered by businesses along Loomis Street and West Cermak
Road to the south. According to a historical Sanborn fire insurance map, the
railroad spur and the alley have existed since at least 1914.
The alley and railroad spur soil (surface soil and subsurface soil) generally consists of silty, clayey, sandy, and gravelly fill materials. In the alley soil, some traces of wood chips, cinders, and pieces of glass, brick, plastic debris, and slag were observed [slag was observed in eight alley soil borings and one railroad spur soil boring]. Slag is a solid-phase waste generated by secondary lead processing. In general, the surface and subsurface railroad soil contained more gravel than the alley soil. The western portion of the railroad spur west of Loomis street also contained vegetation (weeds) and garbage.
See the attached photo to the PolRep, which shows all the 10 areas for the Site.
In addition to the information provided in the previous section. The geographical coordinates for the alley portion of the Site are 41° 51'
10.38" North latitude and 87° 39' 35.54" West longitude. The geographical coordinates for the railroad
portion of the Site are 41° 51' 13.58" North latitude and 87° 39'
41.66" West longitude. The Site is an industrial site in a residential neighborhood with a
portion of it (Western Area of the Railroad Spur west of Loomis Street) located
within a ¼-mile of two schools - Juarez and the Manuel Perez Jr. Elementary
School (Perez). Two City of Chicago
parks are located within a ½-mile-radius of the Site, Dvorak Park and Throop
Park.
1.1.2.2 Description of Threat
EPA Removal Site Assessment
analytical results document high levels of Lead in soil at or near the surface (which exceed the EPA Removal Management Level of 800 mg/kg for industrial use scenario). Access to the Alley is unrestricted and the fence in portions of the railroad spur is inadequate to prevent trespassers. The surface soil at the Site has the potential to migrate offsite via wind, rain, vehicular and
pedestrian traffic, or manual dispersion and presents a threat of exposure to the residents and workers in the surrounding area.
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
EPA conducted a removal site assessment from Dec. 2012 to 2013 in the field and found that average alley surface soil total lead was 2419 mg/kg. Average railroad spur surface soil total lead was 4340 mg/kg. In addition to the high concentrations of total lead, two soil samples from the alley and one from the railroad spur collected from 0 to 6 inches bgs contained TCLP lead at concentrations exceeding the TCLP lead regulatory limit of 5.0 mg/L in 40 C.F.R. § 261.24(b).
|
|
2. Current Activities
|
|
|
2.1 Operations Section
|
|
|
|
2.1.1 Narrative
Responsible Parties initiated the cleanup on 11/16/2015. EPA OSC and EPA START oversaw the cleanup onsite at all times. The overall goal of the removal action is to remove the threat of lead exposure to surrounding residents and workers from surface soil through: 1) removal of soil contaminated with high levels of lead above the EPA RML, and 2) placement of permanent covers at the Site.
2.1.2 Response Actions to Date
(Response actions from 11/16 to 11/20/2015.)
BNSF (Railroad PRP) and its contractors mobilized to the site and completed removal of about 1150 feet of rail and about 575 wooden railroad ties in Site Areas: 1,2,4,5,6,8,&10 (see photo attached to POLREP). The railroad ties were transported off-site to a BNSF staging area (near the Site) for disposition (at an energy recovery facility) at later date. The rails were staged in a gated empty lot next to the Site (after getting owner permission) for recycling at a later date. At all phases of the cleanup water was discharged on to the ground in the work areas to ensure dust control. In addition, sidewalks were also cleaned to make sure that dirt tracked in and out by vehicles was removed (swept back to the Site). (Work to remove the rails and ties was completed on 11/19/2015).
GHD (H.Kramer and & Co. contractors) coordinated the cleanup crews onsite and conducted particulate monitoring (upwind and downwind). BNSF conducted its own worker personal protection air monitoring (under OSHA). The personal protection air monitoring results were below the criteria to the extent that the workers were able to go to a PPE modified level D on 11/17 after being in Level C on 11/16.
EPA OSC and START contractors observed the cleanup to ensure compliance with the work plan and conducted air monitoring in coordination with GHD.
GHD and EPA conduct air monitoring using DataRAM
4 and DustTraks for dust in air. EPA utilized a
Gilian to monitor START personnel exposure, sampling for arsenic, cadmium, chromium,
and lead particulates in air.
EPA START reported that the average DataRAM 4 downwind dust particulate reading for
this week was 0.0140 mg/m3. The average pDR dust particulate
reading for this week was 0.0094 mg/m3. (The action levels
START developed for the site are 0.812 mg/m3 for Areas 8 and 9, 1.19
mg/m3 for Areas 4, 5, 6, 7, and 10, and 3.19 mg/m3 for
Areas 1 and 2.) GHD has a single action level of 0.480 mg/m3. The off-site dust particulate action level is any sustained downwind reading of
0.150 mg/m3 above background or the upwind reading. No action
levels (for dust) were exceeded.
EPA OSC and GHD met with the principal (Benito Juarez Academy, High School adjacent to Areas 1 and 2) to coordinate work schedule and addressed all health and safety concerns from the high school. Controls such as maintaining safe distance and air monitoring carried out by EPA START and OSC (plus BNSF and GHD personnel) were in place to ensure protection of students and teachers.
EPA OSC met with representatives of the Community Group PERRO on 11/16 in the morning. They were concerned about the dust issues and the OSC briefed them on the work and dust controls in place.
EPA OSC coordinating with the Alderman's (Solis) Office to help address homeless trespassers at the Site and an abandoned van and dumpster (blocking work in Area 8). The Van was removed by the City on 11/20/2015.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
On 9/29/2015 EPA signed an Settlement Agreement and Order on Consent For Removal Action with the PRPs for the Site: H.Kramer and Company, City of Chicago, and BNSF Railway Company.
2.1.4 Progress Metrics
| Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
| Railroad ties (wood) |
|
575 feet |
|
|
disposal thru energy recovery |
| Rails (steel) |
|
1150 |
|
|
to be recycled. |
| |
|
|
|
|
|
|
|
|
2.2 Planning Section
|
|
|
|
2.2.1 Anticipated Activities
EPA and START will continue air monitoring and oversight of response activities onsite to ensure compliance with the Administrative Settlement Agreement and Order on Consent (AOC).
2.2.1.1 Planned Response Activities
For the week of 11/23 to 11/25:
GHD contractors will arrive on 11/23 to set up and initiate soil stabilization of soils contaminated with lead above the TCLP in Area 4. Stabilization of Areas 5 and 8 the rest of the week will follow.
Areas 4, 5, and 8 had the highest levels of total lead contamination and exceed the TCLP lead criteria. These soils will be treated (stabilization) in-situ then will be excavated and shipped off-site for disposal.
No work is planned for the rest of the week, November 26-27.
2.2.1.2 Next Steps
In addition to the planned and anticipated activities, OSC will continue to work with EPA community relations to address concerns from the community and media as they come.
2.2.2 Issues
Areas 1 and 2 are areas where the homeless in the neighborhood sleep on a daily basis. OSC is walking down the Site daily before work starts as necessary and working with the Alderman's office to ensure safety of all people at the Site. In addition, crews have found medical waste (needles) and biological waste in addition to the garbage in Areas 1 and 2. EPA and GHD are amending the Health and Safety Plan in the field to ensure worker protection.
|
|
|
2.3 Logistics Section
|
|
|
|
No information available at this time.
|
|
|
2.4 Finance Section
|
|
|
|
|
|
|
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
| TAT/START |
$50,000.00 |
$28,450.00 |
$21,550.00 |
43.10% |
|
Intramural Costs
|
| |
| Total Site Costs |
$50,000.00 |
$28,450.00 |
$21,550.00 |
43.10% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
|
|
|
2.5 Other Command Staff
|
|
|
|
2.5.1 Safety Officer
Ramon Mendoza, EPA OSC
Matt Lazaric, GHD
Daniel Roberts, BNSF contractor
2.5.2 Liaison Officer
2.5.3 Information Officer and Community Relations
Philippa Cannon, EPA (PIO support)
Clarke, Rosita, EPA (Community Relation).
Leon, Heriberto, EPA
|
|
3. Participating Entities
|
|
|
3.1 Unified Command
None
3.2 Cooperating Agencies
City Department of Transportation
Alderman Solis Office (City of Chicago)
|
|
4. Personnel On Site
|
|
|
|
Date
|
BNSF
|
DF Rail Group (BNSF contractor)
|
EPA (OSC)
|
GHD (H.Kramer contractor)
|
Hygieneering BNSF contractor)
|
RW Collins (GHD contractor)
|
START
|
|
11/16/15
|
--
|
4
|
1
|
2
|
1
|
2
|
1
|
|
11/17/15
|
1
|
4
|
1
|
1
|
1
|
--
|
1
|
|
11/18/15
|
1
|
4
|
1
|
1
|
1
|
--
|
1
|
|
11/19/15
|
1
|
4
|
1
|
2
|
1
|
--
|
1
|
|
|
5. Definition of Terms
|
|
|
No information available at this time.
|
|
6. Additional sources of information
|
|
|
No information available at this time.
|
|
7. Situational Reference Materials
|
|
|
No information available at this time.
|
|
POLREP #1 Last Updated 1/30/2020
|
|
|