1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
|
|
Contract Number: |
|
D.O. Number: |
|
|
Action Memo Date: |
|
Response Authority: |
CERCLA |
|
Response Type: |
Emergency |
Response Lead: |
PRP |
|
Incident Category: |
Removal Action |
NPL Status: |
Non NPL |
|
Operable Unit: |
|
Mobilization Date: |
1/20/2010 |
|
Start Date: |
1/20/2010 |
Demob Date: |
1/20/2010 |
|
Completion Date: |
1/20/2010 |
CERCLIS ID: |
|
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
|
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
Emergency Response Action
1.1.2 Site Description
1.1.2.1 Location
The Site is located in a residential area east of Atlanta, Georgia.
1.1.2.2 Description of Threat
Telephone Duty Officer received an NRC Report stating that a citizen was concerned that asbestos containing material was not being handled properly at a neighboring property undergoing demolition.
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
GA EPD responder collected samples of the material to determine if the asbestos is friable. Ga EPD responder was very familiar with the requirements for working with and disposing of asbestos containing material. He is also familiar with the company conducting this demolition and will follow up with them to ensure that all appropriate procedures are adhered to.
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
2.1.1 Narrative
2.1.2 Response Actions to Date
OSC Alyssa Hughes met on site and discussed planned response actions with GaEPD personnel. SOSC collected samples of the material and will be contacting the company responsible for the demolition to ensure that all wastes are handled properly. No additional assistance from EPA was requested.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
The company responsible for the demolition will be responsible for all disposal.
2.1.4 Progress Metrics
Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.2 Planning Section
|
|
|
2.2.1 Anticipated Activities
2.2.1.1 Planned Response Activities
None
2.2.1.2 Next Steps
None
2.2.2 Issues
None
|
|
2.3 Logistics Section
|
|
|
N/A
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
2.5.1 Safety Officer N/A
2.6 Liaison Officer N/A
2.7 Information Officer
2.7.1 Public Information Officer
N/A
2.7.2 Community Involvement Coordinator
N/A
|
3. Participating Entities
|
|
3.1 Unified Command N/A
3.2 Cooperating Agencies N/A
|
4. Personnel On Site
|
|
Ga EPD - 1
US EPA - 1
|
5. Definition of Terms
|
|
No information available at this time.
|
6. Additional sources of information
|
|
No information available at this time.
|
7. Situational Reference Materials
|
|
No information available at this time.
|