1. Introduction
|
|
|
1.1 Background
|
|
|
|
|
Site Number: |
01GB |
|
Contract Number: |
EP-W-08-061 |
|
D.O. Number: |
024 |
|
Action Memo Date: |
8/26/2010 |
|
Response Authority: |
CERCLA |
|
Response Type: |
Time-Critical |
|
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
|
NPL Status: |
Non NPL |
|
Operable Unit: |
|
|
Mobilization Date: |
6/4/2013 |
|
Start Date: |
6/4/2013 |
|
Demob Date: |
7/3/2013 |
|
Completion Date: |
7/3/2013 |
|
CERCLIS ID: |
MAN000105955 |
|
RCRIS ID: |
|
|
ERNS No.: |
|
|
State Notification: |
|
|
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
See POLREP#11
1.1.2 Site Description
See POLREP#11
1.1.2.1 Location
See POLREP#11
1.1.2.2 Description of Threat
See POLREP#11
1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
See POLREP#11
|
|
2. Current Activities
|
|
|
2.1 Operations Section
|
|
|
|
2.1.1 Narrative
The purpose of this POLREP is to document a short remobilization to the site to repair response related damages at residential properties located at 224 Liberty Street and 546 Maxfield Street, New Bedford, MA
2.1.2 Response Actions to Date
See previous POLREPs for actions prior to 6/4/2013.
ERRS mobilized to the site on 6/4/2013 to adjust soil grading and install drainage ditches at 224 Liberty Street, New Bedford, MA. ERRS also replaced a broken PVC clothes line with a steel clothes line at 546 Maxfield Street, New Bedford, MA.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
Please refer to POLREP's #1 through #11
2.1.4 Progress Metrics
Please refer to POLREP #11 for final progress metrics
| Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
| |
|
|
|
|
|
| |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
2.2 Planning Section
|
|
|
|
2.2.1 Anticipated Activities
None. Work completed.
2.2.1.1 Planned Response Activities
None. Work completed.
2.2.1.2 Next Steps
None. Work completed.
2.2.2 Issues
|
|
|
2.3 Logistics Section
|
|
|
|
No information to report at this time
|
|
|
2.4 Finance Section
|
|
|
|
|
|
|
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
| ERRS - Cleanup Contractor |
$50,000.00 |
$35,000.00 |
$15,000.00 |
30.00% |
|
Intramural Costs
|
| |
| Total Site Costs |
$50,000.00 |
$35,000.00 |
$15,000.00 |
30.00% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
|
|
|
2.5 Other Command Staff
|
|
|
|
2.5.1 Safety Officer
No information available at this time
2.5.2 Liaison Officer
No information available at this time
2.5.3 Information Officer
No information available at this time
|
|
3. Participating Entities
|
|
|
3.1 Unified Command
US EPA
MassDEP
3.2 Cooperating Agencies
|
|
4. Personnel On Site
|
|
|
US EPA- 1 OSC
START- 1 Start Lead Person
ERRS- 1 RM, 2 Operators, 2 Laborers
|
|
5. Definition of Terms
|
|
|
No information available at this time
|
|
6. Additional sources of information
|
|
|
6.1 Internet location of additional information/report
http://www.epa.gov/region1/parkerstreet
6.2 Reporting Schedule
|
|
7. Situational Reference Materials
|
|
|
No information available at this time
|
|
POLREP #13 Last Updated 7/11/2013
|