Frank and Poet Oil Spill

All POL/SITREP's for this site Frank and Poet Oil Spill
Taylor, MI - EPA Region V
POLREP #2
Final
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Frank and Poet Oil Spill - Removal Polrep
Final Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V

Subject: POLREP #2
Final
Frank and Poet Oil Spill
E10516
Taylor, MI
Latitude: 42.1946720 Longitude: -83.2342020


To:
From: Brian Kelly, OSC
Date: 9/1/2010
Reporting Period:

1. Introduction
  1.1 Background
   
Site Number: E10516    Contract Number:  
D.O. Number:      Action Memo Date:  
Response Authority: OPA    Response Type: Emergency
Response Lead: EPA    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit:
Mobilization Date: 3/26/2010    Start Date: 3/26/2010
Demob Date:      Completion Date: 6/30/2010
CERCLIS ID:    RCRIS ID:
ERNS No.:    State Notification:
FPN#: E10516    Reimbursable Account #:


1.1.1 Incident Category

Emergency Response

1.1.2 Site Description

The site consists of a small surface water drainage ditch that runs north/south between the addresses of 20401 Gladwin Ave, 15200 and 15801 Huron St. and a Canadian National railroad track.  Approximately 800 feet of ditch line is affected.  The ditch contains open water for approximately 200 feet; then transitions to a covered, drain tile pipe for the remainder of the ditch run until converging with the Frank and Poet Drain upstream of a railroad bridge.  The ditch is 5 to 10 feet wide within the area that presentlycontains limited flowing surface water. The coordinates for the site are  42 degrees, 11 minutes, 39.82 seconds north; and 83 degrees, 13 minutes, 59.94 seconds west. 

1.1.2.2 Description of Threat

Visible oil and sheen were present in the surface water flowing through the ditch.  The ditch discharges to the Frank and Poet drain which is considered "waters of the State." 

1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results

Reconaissance conducted the evening of March 26, 2010 indicated the area containing the majority of visible oil and sheen bordered the K+S Industries facility (20401 Gladwin Ave) and extended downstream in the ditch to the confluence with the Frank and Poet Drain. 

2. Current Activities
  2.1 Operations Section
    2.1.1 Narrative

2.1.2 Response Actions to Date
The Environmental Response Group (ERG) was contracted by K+S Industries to implement defensive measures and prevent the further downstream flow of oil.  ERG deployed boom within the ditch and downstream of the discharge pipe leading to the Frank and Poet drain on March 26, 2010.  ERG deployed straw bundles in the ditch as an added precaution on March 27, 2010.

2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
U.S. EPA provided K+S Industries with a Notice of Federal Interest on March 26, 2010.  As a result, K+S Industries contracted ERG to implement defensive measures in the ditch.  On March 29, 2010 Canadan National Railroad was found to be the owner of the property (drainage ditch/right-of-way) and agreed to takeover the cleanup.  Between March 30 and June 30, CNR excavated the length of the ditch removing all visibable oil.


2.1.4 Progress Metrics

Waste Stream Medium Quantity Manifest # Treatment Disposal
 Oil impacted soil Soil   10 cubic yards      
 Oil / Water  Oil/Water  2,000 gallons      
           



  2.2 Planning Section
   

2.2.1 Anticipated Activities

None





  2.3 Logistics Section
    No information available at this time.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    No information available at this time.

3. Participating Entities
  No information available at this time.

4. Personnel On Site
  No information available at this time.

5. Definition of Terms
  No information available at this time.

6. Additional sources of information
  No information available at this time.

7. Situational Reference Materials
  No information available at this time.