U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Dossie Dews Powell #1 (FPN# E10630) - Removal Polrep
Initial and Final Removal Polrep

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region VI
|
Subject:
|
POLREP #1
Initial / Final
Dossie Dews Powell #1 (FPN# E10630)
Mt. Holly, AR
Latitude: 33.3038900 Longitude: -92.9627620
|
To:
|
|
From:
|
Mark Hayes, Environmental Engineer, OSC
|
Date:
|
6/1/2010
|
Reporting Period:
|
|
1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
FPN E10630 |
|
Contract Number: |
|
D.O. Number: |
|
|
Action Memo Date: |
|
Response Authority: |
OPA |
|
Response Type: |
Emergency |
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
NPL Status: |
Non NPL |
|
Operable Unit: |
|
Mobilization Date: |
|
|
Start Date: |
|
Demob Date: |
|
|
Completion Date: |
|
CERCLIS ID: |
|
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
|
FPN#: |
10630 |
|
Reimbursable Account #: |
|
1.1.1 Site Description
On the evening
of May 19, 2010 EPA was notified by the National Response Center (NRC)
of a oil well that was discharging large amounts of oil onto the ground.
The oil well is located in the Salem Church Field near Mt. Holly, Union
County, Arkansas. The well serviced a production faciity that
consisted of 2-210 barrels (bbls) above ground storage tanks. On the
morning of May 20, 2010 EPA arrived on scene to assess the extent of
impacted area. A pit containing a large quantity of oil was also
identified on the property. There was a visible breach on the
containment berm of the pit.
1.1.1.1 Location
Salem Church
Field near Mt. Holly, Union
County, Arkansas
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
2.1.1 Response Actions to Date
On May 20, 2010, EPA OSC Mark Hayes and EPA-START contractor Dana Beck arrived at the spill
site and observed the conditions. Upon inspection, oil and water was visibly leaking from an opened end of the pit. The only filtration system was straw, no padding or boom was in place. Additionally, a trail of oil was visible from the well stretching down hill to the road and into the ditch. The RP had placed peat moss over the oil for absorption.
As a result of the inspection, OSC Hayes contacted PRP Dossie Dews and requested to meet as soon as possible. Mr. Dews met with OSC Hayes and discussed the situation. The following information was stated by Mr. Dews:
- Vandals robbed the gauges from the well, thus resulting in the leak,
- The opening in the pit firewall had already been there and was used as a way to drain the pit,
- The Columbia County Sheriff's Department had been notified of the vandalism,
- The gauge was replaced as soon as the previous was discovered missing,
- Trees were cut in the past in order to filter the oil from the water as it exited the pit.
OSC Hayes asked the RP to
conduct the following to minimize/mitigate pollution:
- Re-build the pit containment/firewall until the pit can be closed,
- Clean up the drainage pollution from the well leading to the road ditch,
- Utilize absorbent pads and boom to minimize further
contamination.
Arkansas Dept. of Environmental Quality Agent (ADEQ) Connery Salter recommended that the pit should be closed per state requirements as soon as feasibly possible.
On May 21, START Beck visited the facility and observed the RP had re-built the pit containment with a backhoe as well as remove the oil contamination from the well leading to the road.
A follow-up inspection by START Dana Beck on Thursday, May 27, 2010 revealed
that all required remediation steps had taken place. The pit had been closed as well as all contaminated
soil had been removed and disposed per recommendation.
No further action is expected at this time.
2.1.2 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
A Notice of Federal Intent (NOFI) was mailed via Certified Mail (#7009 0080 0000 3340 6769) to the following PRP on May 28, 2010:
Dossie Dews
1452 Dews Road
Mt. Holly, AR 71758
|
|
2.2 Planning Section
|
|
|
|
|
2.3 Logistics Section
|
|
|
No information available at this time.
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
No information available at this time.
|
3. Participating Entities
|
|
No information available at this time.
|
4. Personnel On Site
|
|
No information available at this time.
|
5. Definition of Terms
|
|
No information available at this time.
|
6. Additional sources of information
|
|
No information available at this time.
|
7. Situational Reference Materials
|
|
No information available at this time.
|
|
|