BP Terminal Indianapolis

All POL/SITREP's for this site BP Terminal Indianapolis
Indianapolis, IN - EPA Region V
POLREP #53
Progress Polrep
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
BP Terminal Indianapolis - Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region V

Subject: POLREP #53
Progress Polrep
BP Terminal Indianapolis

Indianapolis, IN
Latitude: 39.8027163 Longitude: -86.2160273


To:
From: Paul Atkociunas
Date: 2/16/2016
Reporting Period: January 15 to February 14, 2016

1. Introduction
  1.1 Background
   
Site Number: Z5K6    Contract Number:  
D.O. Number:      Action Memo Date:  
Response Authority: OPA    Response Type: PRP Oversight
Response Lead: PRP    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit:
Mobilization Date:      Start Date: 11/14/2011
Demob Date:      Completion Date:  
CERCLIS ID:    RCRIS ID:
ERNS No.:    State Notification:
FPN#: E11504    Reimbursable Account #:

1.1.1 Incident Category
Manufacturing/processing/maintenance - oil and gas storage

1.1.2 Site Description
The BP Indianapolis Terminal (the site) began operating as a petroleum storage and distribution facility since 1941.  The site consists of an administrative building, service garage, petroleum distribution rack, miscellaneous warehouse and pumping station sheds, oil/water separator, underground storage tanks (UST) and aboveground storage tanks (AST), which contain gasoline, diesel, ethanol, furnace oil, and heating oil. AST capacity ranges from 672,000 to 3,360,000 gallons, with a total capacity exceeding 18,000,000 gallons.

1.1.2.1 Location
The site is a 41-acre bulk terminal located at 2500 North Tibbs Avenue in Indianapolis, Marion County, Indiana, 46222.  Site coordinates are 39.8027163 degrees north latitude and 86.2160273 degrees west longitude.  The site is bordered by commercial property to the north; shopping plaza to the northeast; Ferguson Industrial Plastics Division and a fire station to the east; undeveloped property to the south; and Little Eagle Creek to the west.

1.1.2.2 Description of Threat
Environmental investigations conducted by BP and its consultants documented that there are petroleum-related groundwater impacts from benzene, toluene, ethylbenzene, xylenes (BTEX), methyl tertiary butyl ether (MTBE), naphthalene, ethanol, and polynuclear aromatic hydrocarbons (PAH) including benzo(a)anthracene, benzo(a)pyrene, benzo(k)fluoranthene, chrysene, dibenz(a,h)anthracene, and indeno(1,2,3-cd)pyrene beneath the site.  Light Non-Aqueous Phase Liquid (LNAPL) and dissolved-phase contamination have been found in a shallow aquifer beneath the Site and at seeps along Little Eagle Creek.  

1.1.3 Preliminary Removal Assessment/Removal Site Inspection Results
Refer to previous Pollution Reports (PolReps).

2. Current Activities
  2.1 Operations Section
   

2.1.1 Narrative
The site was previously in the Voluntary Remediation Program (VRP) of the Indiana Department of Environmental Management (IDEM).  IDEM referred the site to the U.S. Environmental Protection Agency (EPA) on December 13, 2010.  On November 14, 2011, EPA executed an Administrative Order by Consent (AOC) under Section 311 of the Clean Water Act.  The AOC requires BP to implement removal measures to prevent migration of petroleum hydrocarbon impacted groundwater into Little Eagle Creek. 

2.1.2 Response Actions to Date
Please refer to previous Polreps for actions prior to this reporting period.  During the reporting period, Kinder Morgan Liquids Terminals LLC / BP conducted the following actions:

  • Conducted routine maintenance on the groundwater extraction and treatment system.
  • Conducted the monthly light non-aqueous phase liquid (LNAPL) recovery on January 15, 2016. 
  • Monthly Little Eagle Creek surface water sampling was not conducted in January due to frozen conditions. Three separate attempts were made to sample the creek on January 22, 25, and 29, 2016, but were unsuccessful.

2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)

EPA executed Docket No. V-W-11 C-984, an AOC with BP on November 14, 2011.  On or about February 1, 2016, BP Products North America sold the terminal to Kinder Morgan.  Kinder Morgan Liquids Terminals LLC (KMLT) currently operates the facility.  BP Products North America Inc. is the owner of the site.  Paragraph 6 of the AOC states the Order applies to persons who succeed to a controlling interest in BP. The AOC also states that any change in ownership or corporate status of Respondent, including but not limited to a transfer of assets or real or personal property relating to the site, will not alter BP's responsibilities under the Order.          

2.1.4 Progress Metrics
On September 8, 2014, BP submitted a data package for the design of a Modified GWET system in accordance with the AOC.  EPA provided comments and BP submitted a Revised Modified GWET system data package.  On October 27, 2014, EPA approved the design in the Modified GWET Data Package, which is incorporated and fully enforceable under the AOC.   
        

Milestone Date Due Date Done
Effective Date (ED) 11/14/2011 11/14/2011
LNAPL Recovery, Quarterly Creek & MW Sampling 11/14/2011 11/14/2011
Contractor Notification 11/21/2011 11/21/2011
Project Coordinator Notification 11/21/2011 11/21/2011
HASP Submittal 12/6/2011 12/6/2011
QAPP Submittal 12/6/2011 12/6/2011
HASP/QAPP Approval (HQA)   1/5/2012
HASP/QAPP Revisions 1/13/2012 1/13/2012
LNAPL Recovery, Creek Sampling Locations Notification, Quarterly MW Sampling 1/27/2012 1/27/2012
Creek and Groundwater Sampling Locations Revisions 2/17/2012 2/21/2012
Creek Sampling Location Approval (CS)   2/21/2012
Monthly Creek Sampling 3/6/2012 3/6/2012
On-Site Construction 12/14/2011 8/30/2011
Construction Complete 3/19/2012 3/19/2012
Investigation Work Plan 2/12/2012 2/12/2012
Revised Work Plan 4/13/2012 4/13/2012
Investigation Complete (IC)    
  - Supplemental soil characterization   6/18/2012
  - Supplemental groundwater characterization   6/22/2012
  - Supplemental surface water characterization (normal flow)   10/8/2012
  - Supplemental surface water characterization (low flow)   6/27/2012
  - Supplemental sediment characterization   6/27/2012
  - Natural Resources Assessment   8/19/2013
  - Sediment toxicity testing and analysis (benthic testing)   8/19/2013
  - Aquifer testing   10/20/2012
Investigation Report 1/28/2013 1/28/2013
Investigation Report Approval (IRA)   1/21/2014
Removal Work Plan 3/24/2014 3/24/2014
Removal Work Plan Approval (RWA)    6/9/2014
Removal  3/30/2015
Final Report    


  2.2 Planning Section
   

2.2.1 Anticipated Activities
The following sections discuss planned response activities and next steps.

2.2.1.1 Planned Response Activities
During the next reporting period, KMLT / BP will:

  • Continue to provide oversight and documentation support to the OSC;
  • Perform the Little Eagle Creek monthly surface water sampling event, weather and stream levels permitting;
  • Provide EPA a Capture Zone Analysis Report; and
  • Continue monthly LNAPL recovery and operation and maintenance (O&M) of the GWET system.

2.2.1.2 Next Steps
EPA will continue to conduct oversight of the removal action and monitor progress / compliance with the AOC.  EPA will review the Capture Zone Analysis Report.       

2.2 Issues
None.

  2.3 Logistics Section
    Not applicable (NA)

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    2.5.1 Safety Officer
KMLT / BP is conducting work associated with the AOC at the site under an approved Health and Safety Plan (HASP).

2.6 Liaison Officer
NA

2.7 Information Officer
NA

2.7.1 Public Information Officer
NA

2.7.2 Community Involvement Coordinator
NA

3. Participating Entities
  3.1 Unified Command
NA

3.2 Cooperating Agencies
IDEM
Marion County Public Health Department

4. Personnel On Site
  NA

5. Definition of Terms
 
AOC Administrative Order by Consent
AST Aboveground Storage Tank
BTEX Benzene, toluene, ethylbenzene, xylenes
EPA Environmental Protection Agency
FPN Federal Project Number
GWET
HASP
Groundwater Extraction and Treatment System
Health and Safety Plan
IDEM Indiana Department of Environmental Management
LEL  Lower Explosive Limit
LNAPL Light Non-Aqueous Phase Liquid
MTBE Methyl teriary butyl ether
NA Not Applicable
O&M Operation and Maintenance
OSC On-Scene Coordinator
PAH Polynuclear aromatic hydrocarbons
PolRep Pollution Report
PRP Potentially Responsible Party
START Superfund Technical Assessment and Response Team
UST Underground Storage Tank
VRP Voluntary Remediation Program


6. Additional sources of information
  6.1 Internet location of additional information/report
Additional information can be found at www.epaosc.org/bpterminalindy.

6.2 Reporting Schedule
The OSC will submit the next PolRep on or about March 16, 2016. 