1. Introduction
|
|
1.1 Background
|
|
|
Site Number: |
A4DD |
|
Contract Number: |
|
D.O. Number: |
|
|
Action Memo Date: |
9/13/2011 |
Response Authority: |
CERCLA |
|
Response Type: |
Time-Critical |
Response Lead: |
EPA |
|
Incident Category: |
Removal Action |
NPL Status: |
NPL |
|
Operable Unit: |
|
Mobilization Date: |
8/9/2011 |
|
Start Date: |
8/9/2011 |
Demob Date: |
|
|
Completion Date: |
|
CERCLIS ID: |
SCD003358744 |
|
RCRIS ID: |
|
ERNS No.: |
|
|
State Notification: |
|
FPN#: |
|
|
Reimbursable Account #: |
|
1.1.1 Incident Category
Inactive Production Facility (former textile mill).
1.1.2 Site Description
The former US Finishing/Cone Mills site is located at 3555 Old Buncombe Road approximately 3 miles north of downtown Greenville, SC. This facility operated as a textile mill until November 2003 when the main plant was partially destroyed by fire. American Fast Print is the current property owner of a large portion of the 256 acre facility. In July 2004, Piper Properties purchased approximately 19 acres of the 256 acre property along a section of the Reedy River. The property associated with the site is currently in temporary receivership as part of a bankruptcy proceeding.
The US Finishing/Cone Mills site was referred to the Removal Program by the Remedial Program. For a chronological summary of environmental enforcement associated with this site please see the previous POLREPs.
|
2. Current Activities
|
|
2.1 Operations Section
|
|
|
2.1.1 Narrative
2.1.2 Response Actions to Date
The fire which occurred in 2003 destroyed approximately 130,000 square feet of the 400,000 square foot factory and warehouse. Asbestos insulation was present throughout the debris associated with the damaged portion of the factory. WRSCompass, the ERRS contractor for EPA, segregated the debris so that the debris could be managed in a cost effective manner. The debris was segregated into three primary waste streams: asbestos wrapped pipping, steel beams, and miscellaneous debris.
The asbestos wrapped pipping was wetted with a wetting agent, double wrapped in plastic and labeled with asbestos warning labels, and sent to an off site subtitle D landfill for disposal. The steel beams and other ferrous metals were recycled at a local metal scrap yard. The miscellaneous debris which contained Asbestos Containing Material (ACM) associated with the roofing material and small pieces of asbestos not removed with the asbestos wrapped pipping, was placed in two on-site waste cells and capped with soil and a vegetative cover. A Closure Plan outlining the construction for the waste cells was generated prior to the work and a copy of the Closure Plan was submitted to the state.
The former Power Plant building contained a high concentration of asbestos wrapped pipping. The fire compromised the buildings ability to contain the asbestos but unlike the factory, the structural integrity of the Power Plant was not compromised by the fire. Winter Environmental was hired to perform an asbestos abatement within the Power Plant building. The asbestos material removed during the abatement by Winter Environmental was combined with the asbestos wrapped pipping collected by WRSCompass and sent to a subtitle D regulated landfill for disposal.
Air quality during the removal action was monitored within the work zone (hot zone) and at the perimeter of the property. The perimeter air quality was monitored 24 hours a day for particulates by Ebam units surrounding the periphery of the site. This data was also supplemented through the collection of air samples collected during work hours and the samples submitted to the laboratory for asbestos and lead anaylsis.The results of the perimeter air monitoring indicated that OSHA action levels for particulates, lead and asbestos were not exceeded during the removal activities.
The data from the Ebam units was uplinked to the website at http://usfinishing-conemills.com for public viewing. Laboratory data for lead and asbestos analysis was also published on the website for public viewing. Two web cameras were used to stream video of the removal activities to the website for public viewing.
2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)
2.1.4 Progress Metrics
The asbestos associated with the asbestos wrapped pipping and the asbestos abatement was sent to both the Safeguard Landfill Management, 6895 Roosevelt Highway, Fairburn, GA., and the Palmetto Landfill & RC, 251 New Hope Road, Wellford, SC.
Waste Stream |
Medium |
Quantity |
Manifest # |
Treatment |
Disposal |
Scrap Iron |
|
11,004 tons |
|
|
Recycling |
ACM debris |
|
18,702 cubic yards |
|
|
On-Site Waste Cell |
Asbestos |
|
21.04 tons |
|
|
Safeguard Landfill and Palmetto Landfill |
|
|
|
|
|
|
|
|
2.2 Planning Section
|
|
|
2.2.1 Anticipated Activities
The WRSCompass crew is pressure washing the concrete slab and cleaning the asphalt roadways prior to demobilization. EPA's ERT contractor was on site this week to disassemble the VIPER air monitoring system. The investigation derived waste left on site from previous investigations will be analyzed for disposal purposes and disposal arrangement made for this waste.
Several small (5 through 20 gallon) plastic containers were present in buildings throughout the site. Several of these containers contained unknown liquid substances. These liquids were sampled for characterization and disposal purposes. Seven switches (metal housing units between 2-6 feet in length) containing mercury were discovered in the water treatment building. The mercury was collected from these units and will be shipped off site for disposal.
2.2.1.1 Planned Response Activities
2.2.1.2 Next Steps
2.2.2 Issues
|
|
2.3 Logistics Section
|
|
|
No information available at this time.
|
|
2.4 Finance Section
|
|
|
No information available at this time.
|
|
2.5 Other Command Staff
|
|
|
No information available at this time.
|
3. Participating Entities
|
|
No information available at this time.
|
4. Personnel On Site
|
|
No information available at this time.
|
5. Definition of Terms
|
|
No information available at this time.
|
6. Additional sources of information
|
|
6.1 Internet location of additional information/report
EPAOSC USFCM Webpage
http://www.usfinishing-conemills.com/
http://www.atsdr.cdc.gov/asbestos/
6.2 Reporting Schedule
|
7. Situational Reference Materials
|
|
No information available at this time.
|